background image

Safety declaration form

 for vacuum pumps and components

 

Page 1 of 1

Gardner Denver Schopfheim GmbH

Roggenbachstr. 58, 79650 Schopfheim

Phone: +49/(0)7622/392-0    Fax: +49/(0)7622/392-300

Repairs and/or maintenance of vacuum pumps and components will only be carried out if a declaration has been
filled in correctly and completely.
If not, the repair work cannot be started and delays will result. 
This declaration must only be filled in and signed by authorised  qualified staff.

Type description:
Machine number
Order number:
Delivery date:

3. Condition of vacuum pumps/ components

4. Contamination of the vacuum pumps/

Was this being operated?

YES    

‰

NO    

‰

   components when in use

Which lubrication was used?

Toxic

YES    

‰

NO    

‰

Corrosive

YES    

‰

NO    

‰

Was the pump/ component emptied?

Microbiological

*)

YES    

‰

NO    

‰

(Product/Consumables)

YES    

‰

NO    

‰

Explosive*)

YES    

‰

NO    

‰

Has the pump/ component been cleaned and decontaminaRadioactive*)

YES    

‰

NO    

‰

other

YES    

‰

NO    

‰

YES    

‰

Cleaning agent:
Cleaning method:

*) Microbiological, explosive or radioactively contaminated vacuum pumps/ components will only be accepted
   with proof that they have been cleaned properly.
Type of toxic substance or process-related, dangerous reaction products with which the vacuum pumps/ 
components came into contact:

Trade name, manufacturer's  Chemical 

Hazard 

Action to be taken if toxic 

First aid in the event of 

product name

name

class

substances are released

accidents

1
2
3
4

Personal protection measures:

Hazardous decomposition products when subjected to thermal load

YES    

‰

NO    

‰

Which?

5. Legally binding declaration

We swear that the information in this declaration is accurate and complete and that I, the undersigned, am in a 
position to judge this. We are aware that we are liable to the contractor for damage caused by incomplete and 
inaccurate information. We undertake to release the contractor from any damage claims from third parties arising 
from incomplete or incorrect information. We are aware that, regardless of this declaration, we are directly liable 
to third parties including in particular the contractor's staff entrusted with handling or repairing the product.

Company:
Street:

Post code/ Town:

Phone:

Fax:

Name (in capitals)

Position:

Date:

Company stamp:

Legally binding signature:

TOS no. / Index: 7.7025.003.17 / 03

Office responsible: GS

File management: ..\7702500317.xl

Gardner Denver Schopfheim GmbH Postfach 1260  D-79642 Schopfheim

2. Reason for the submission

1. Type of vacuum pumps/ components

7.7025.003.17

Summary of Contents for Elmo Rietschle V-VTR 100

Page 1: ...V V Serie V Series Drehschieber Rotary Vane Edition 1 12 2009 BA 261 En Original Operating Instructions V VTR V VTR 100 140...

Page 2: ...y notes for the operator 8 2 8 Safety instructions for installing commissioning and maintenance 9 2 9 Guarantee conditions 9 3 Transport storage and disposal 10 3 1 Transportation 10 3 1 1 Unpack and...

Page 3: ...mbH Table of contents 7 Maintenance and repair 19 7 1 Ensuring operational safety 19 7 2 Maintenance work 19 7 2 1 Lubrication 20 7 2 2 Blades 20 7 2 3 Air ltering 22 7 2 4 Coupling 23 7 3 Repair Serv...

Page 4: ...ns is technically trained specialists 1 3 Supplier documentation and accompanying documents Document Contents No Supplier documentation Operating Instructions BA 261 EN Declaration of Conformit C 0075...

Page 5: ...r Vacuum pump Machine to create a vacuum Rotary vane Machine s design or active principle Pumping capacity Vacuum pump volume ow related to the condition in the suction con nection Final pressure abs...

Page 6: ...tions for installation commissioning maintenance and inspection work which must be obeyed to en sure the safe operation of the machine and prevent physical and material damage The safety instructions...

Page 7: ...convey air with a relative humidity of 30 90 all non explosive non in ammable non ag gressive and non poisonous dry gases and gas air mixtures 2 4 Unacceptable operating modes extracting conveying and...

Page 8: ...stallation commissioning maintenance and inspection work Working with electricity personnel being trained to work on the ma chine must be supervised by technical special ists only 2 6 Safety conscious...

Page 9: ...ive devices again immediately after nishing work Vor Wie derinbetriebnahme die aufgef hrten Punkte f r die Inbetriebnahme beachten Conversion work or modi cations to the ma chine are only permissible...

Page 10: ...WARNING Death or limbs crushed as a result of the items being transported falling or tipping over When transporting with the lifting device remem ber a Select the lifting device suitable for the tota...

Page 11: ...uidelines Page 4 3 3 Disposal WARNING Danger from in ammable corrosive or poison ous substances Machines that come into contact with hazard ous substances must be decontaminated before disposal When d...

Page 12: ...C S M P B W 4 Set up and operation 4 1 Setup Fig 2 Vacuum pump V VTR 100 V VTR 140 A Vacuum connection B Exhaust air outlet C Vacuum regulating valve E Cooling air inlet F Cooling air outlet G Inlet...

Page 13: ...g rotary vane vacuum pumps V VTR 100 and V VTR 140 are suitable for evacuating closed systems and for a permanent vacuum in the intake pressure range 150 1000 mbar abs The pumping capacity with unrest...

Page 14: ...way from adjacent walls Cooling air coming out must not be sucked in again or maintenance work there must be a minimum of 40 cm in front of the lter housing Fig 2 S and the inlet grating Fig 2 G 5 2 I...

Page 15: ...n pipe is connected correctly NOTICE Length of the connection pipes With connection pipes that have the same pipe cross section as the machine connection and are more than 3m long a non return valve e...

Page 16: ...motor s terminal box not for the plug connec tion version Compare the motor data with the data of the existing mains network current type voltage network frequency permitted current value b Connect t...

Page 17: ...hen the machine is at operating temperature the surface temperatures on the components Fig 2 Q may go above 70 C You must avoid touching the hot surfaces marked with warning plates CAUTION Noise emiss...

Page 18: ...phase sequence indicator to check the direction of rotation anti clockwise rotating eld 6 2 Decommissioning storing Stop the machine a Switch the machine off b If available close the cut off device i...

Page 19: ...for installation com missioning and maintenance The whole unit should always be kept in a clean condition 7 2 Maintenance work Interval Maintenance to be carried out Section monthly Check the pipes an...

Page 20: ...5 c on the B bearing We recommend the following brands of grease Kl berPetamoGY193 or other equivalent greases see also grease recommendation plate Fig 4 M 7 2 2 Blades Blade check V VTR models have 4...

Page 21: ...o grease residue should be wiped off the end of the shaft and where the shaft passes through the housing lid Otherwise this grease would get into the compressor housing and would mix with the blade we...

Page 22: ...he lters their separation ef ciency will continue to deteriorate Therefore the lters should be replaced every six months The lter cartridges Fig 7 e and Fig 7 f can be removed for cleaning after undoi...

Page 23: ...n Undo the screws Fig 9 s5 on the motor ange Fig 9 n Remove the motor axially with the half of the coupling on the motor side Fig 5 q and sus pend with the lifting device If the sprocket Fig 9 k is da...

Page 24: ...s Please contact the manufacturer for the address of the service centre responsible for you see Manufac turer s address NOTICE For each machine that is sent to an Elmo Rietschle Servicecentreforinspec...

Page 25: ...ds Product Documents V Series Spare Parts Parts subject to wear and gaskets are indi cated separately on the list Web site http www service er de Select the type size and design NOTICE Only use origin...

Page 26: ...rm excess current at start up version with short circuit and overload trigger as per VDE 0660 Part 2 orIEC 947 4 The blow out lter cartridge accessory is dirty Clean or replace the lter cartridges Sec...

Page 27: ...supply is ob structed Check environmental condi tions Section 5 1 Clean ventilation slots Section 7 2 The blow out lter cartridge accessory is dirty Clean or replace the lter cartridges Section 7 2 3...

Page 28: ...ight kg 122 127 Length mm 842 859 Width mm 406 406 Height mm 368 368 Vacuum connection G 11 4 G 11 4 The length and the weight may differ from the information listed here depending on the motor manufa...

Page 29: ......

Page 30: ...Denver s Industrial Products Division and part of Blower Operations www gd elmorietschle com er de gardnerdenver com Gardner Denver Schopfheim GmbH Roggenbachstra e 58 79650 Schopfheim Deutschland Te...

Page 31: ...oltage limits codified version The following harmonized and national standards and specifications are applied EN 1012 1 1996 Compressors and vacuum pumps Safety requirements Part 1 Compressors EN 1012...

Page 32: ...ance or process related dangerous reaction products with which the vacuum pumps components came into contact Trade name manufacturer s Chemical Hazard Action to be taken if toxic First aid in the even...

Reviews: