S14
M03
S14
M03
S14x2pcs
1
2
3
L06
L05D
L05D
L04A
A03
S11/M03
4
L04Ax4pcs
34
S11x2pcs
L22
L22
L22
L05D
L05D
1
1
L04A
L04A
L22
L22
L22
2
2
2
3
L04A
L04A
L22
L22
L22
4
L05D
Install the L04A vent frame profile and the A03 handle frame profile.
Handle frame A03 is not required if auto openers are installed.
Install L04A and L05D at the same time.
When installing L05D ensure that you leave one bolt in the bolt channel for L22.
Install the L22 ridge and eaves struts.
The L22 struts are fitted horizontally at the ridge and diagonally at the eaves.
Ensure 2 bolts are inserted in the
bolt channel for the A03 handle.
The frame is now complete. Once you start the glazing ensure that you complete it.
Do not leave the greenhouse half glazed as this may cause damage.
L04A
4
S11
8
M6X20
A03
4
L05D
6
PART
NO
QTY
S14
38
M6X10
M03
M6
46
L22
9