background image

After Sales Support     TEL: 1300 130 579     WEB: www.rossmac.com

6

8. Setting the ON/OFF switching point
(Fig. 4+5)

The ON/OFF switching point can be infinitely
adjusted with the height adjustment facility. 

Before you put the pump into operation, please check
the following:

The float switch must be installed so that the level
of the ON operating point and the level of the OFF
operating point can be reached easily and with
little force. To check this, place the pump in a
vessel filled with water, raise the float switch
carefully by hand and then lower it again. As you
do so, note whether the pump switches on and off.

Make sure that the distance between the float
switch head and the latching holder is not too
small. Proper operation is not guaranteed if the
gap is too small.

When you set the float switch, make sure that it
does not touch the base before the pump switches
off. 

Caution! Risk of running dry.

9. Technical Data

Power supply

240V ~ 50Hz

Power consumption

1,000 Watt

Delivery rate max..

20.000 L/h

Delivery height max

8 m

Immersion depth max.

5 m

Water temperature max.

35°C

Hose connection

1 1/2“ threaded end

Foreign bodies up to

dia. 20 mm

Switching point height: ON

max. approx. 50 cm

Switching point height: OFF

min. approx. 5 cm

10. Performance data

11. Disposal and recycling

The unit and its accessories are made of various
types of material, such as metal and plastic.
Defective components must be disposed of as
special waste. Ask your dealer or your local council.

12. Ordering replacement parts

Please quote the following data when ordering
replacement parts:

Type of machine

Article number of the machine

Identification number of the machine

Replacement part number of the part required

4

5

Delivery head

Delivery rate

2 m

max.: 18,200 l/h

4 m

max.: 14,800 l/h

6 m

max.: 10,400 l/h

8 m

max.:  7,170 l/h

Anleitung GLSP 1002_SPK7:Anleitung GLSP 1002_SPK7  27.06.2008  11:25 Uhr  Seite 6

Summary of Contents for GLSP1002

Page 1: ...Operating Instructions N16188 Anleitung GLSP 1002_SPK7 Anleitung GLSP 1002_SPK7 27 06 2008 11 25 Uhr Seite 1...

Page 2: ...within its intended use over the course of the first year after the date of purchase we will remedy the problem as quickly as possible once it has been brought to our attention In the unlikely event...

Page 3: ...ction page 5 5 Areas of application page 5 6 Starting up page 5 7 Maintenance instructions page 5 8 Setting the ON OFF switching point page 6 9 Technical data page 6 10 Performance data page 6 10 Wast...

Page 4: ...ust be protected from moisture If there is danger of flooding the electrical connections must be taken to higher ground Circulation of aggressive fluids as well as the circulation of abrasive material...

Page 5: ...re cord has been attached properly Check if electrical connection is 240 V 50 Hz Check if socket is in good condition Make sure that water and humidity can never come to the mains supply Avoid pump ru...

Page 6: ...ase before the pump switches off Caution Risk of running dry 9 Technical Data Power supply 240V 50Hz Power consumption 1 000 Watt Delivery rate max 20 000 L h Delivery height max 8 m Immersion depth m...

Page 7: ...let sieve is clogged Reduced pumping capacity by dirty and abrasive water Thermal cutout stops pump due to dirty water Water too hot Thermal cutout stops pump Solutions Check mains supply Adjust float...

Page 8: ...t of documentation and papers accompanying products is permitted only with the express consent of ISC GmbH Technical changes subject to change Never place any electric tools in your household refuse S...

Reviews: