After Sales Support TEL: 1300 130 579 WEB: www.rossmac.com
6
8. Setting the ON/OFF switching point
(Fig. 4+5)
The ON/OFF switching point can be infinitely
adjusted with the height adjustment facility.
Before you put the pump into operation, please check
the following:
●
The float switch must be installed so that the level
of the ON operating point and the level of the OFF
operating point can be reached easily and with
little force. To check this, place the pump in a
vessel filled with water, raise the float switch
carefully by hand and then lower it again. As you
do so, note whether the pump switches on and off.
●
Make sure that the distance between the float
switch head and the latching holder is not too
small. Proper operation is not guaranteed if the
gap is too small.
●
When you set the float switch, make sure that it
does not touch the base before the pump switches
off.
Caution! Risk of running dry.
9. Technical Data
Power supply
240V ~ 50Hz
Power consumption
1,000 Watt
Delivery rate max..
20.000 L/h
Delivery height max
8 m
Immersion depth max.
5 m
Water temperature max.
35°C
Hose connection
1 1/2“ threaded end
Foreign bodies up to
dia. 20 mm
Switching point height: ON
max. approx. 50 cm
Switching point height: OFF
min. approx. 5 cm
10. Performance data
11. Disposal and recycling
The unit and its accessories are made of various
types of material, such as metal and plastic.
Defective components must be disposed of as
special waste. Ask your dealer or your local council.
12. Ordering replacement parts
Please quote the following data when ordering
replacement parts:
앬
Type of machine
앬
Article number of the machine
앬
Identification number of the machine
앬
Replacement part number of the part required
4
5
Delivery head
Delivery rate
2 m
max.: 18,200 l/h
4 m
max.: 14,800 l/h
6 m
max.: 10,400 l/h
8 m
max.: 7,170 l/h
Anleitung GLSP 1002_SPK7:Anleitung GLSP 1002_SPK7 27.06.2008 11:25 Uhr Seite 6