5. Bolt the door track to the horizontal door frame head as shown in Figure 2.9. If required the bolts can be
tightened or loosened later when the door is fitted to ensure smooth opening.
6. Fix the door stop to the door frame as shown in Figure 2.10. If required the stops can be adjusted later
when the door is fitted to limit the door opening.
SIDE WALL ASSEMBLY – see Page
5
1. Page 5 of the instructions shows the sidewall assembly.
2. Pack 3 includes the main components required for the side wall assembly.
3. Loosely connect the main components with all bolts finger tightonly.
4. Figure3.2.Before fixing the vertical glazing bars slide extra bolts into the bolt channels(2015) as
required to fix the braces later . If you forget this you can disconnect the glazing bars later and add
the extra bolts but it takes longer.
WALL AND ROOF ASSEMBLY – see Page6
1. Page 3 of the instructions shows how to complete the wall and roofassembly.
2. Pack 4 includes the main components required to complete the roof assembly.
3. Loosely connect the main components with all bolts finger tightonly.
4. Join the walls together as shown in thedetail drawings.
5. Fix the main ridge beam to the roof corner glazing bars as shown in the detail drawings.
6. Figure 4.7.Before fixing the roof glazing bars slide extra bolts into the bolt channels as required to
fix the struts and roof vent framing. If you forget this you can disconnect the glazing bars later and add
the extra bolts but it takes longer.
7. Position the completed greenhouse structure on the base plinth and connect the glazing bars to the
base using the base clips as shown on Page 1. Loosely connect the bolts so they are only finger
tight. Check that the greenhouse is level and square and make adjustments as required before
tightening the bolts. Do not overtighten thebolts.
8. Clip the plastic cover caps
over the ends of the gutter.
9. Clip the plastic cover caps
over the ends of the roof corner glazing bars.
DOOR ASSEMBLY – see Page8
1. Page 8 of the instructions shows how to assemble the door.
2. Pack 5 includes the main components required to assemblethe door.
3. Connect the main door components as shown in the main drawing. Screw through the
vertical framing into the screw channels in the horizontalrails.
4. Push the plastic door sliders into the ends of the door kick rails as shown in Figure
5.4 before assembling the door.
5. Bolt the curved door head rail to the door frame head as shown in Figure 5.4.
6. Bolt the door rollers to the curved door head rail as shown in Figure 5.4 using the correct
bolts, washers andnuts.
7. Fit the top of the door by sliding the door rollers into the channel in the door track.
8. Fit the bottom of the door by hooking the door sliders over the cill as shown in Figure 5.9.Figure5.10.
9. Push the rubber weather strips into the grooves in the vertical door framing as shown in
cross section sketch 5.1.
10. Adjust the doors as required to ensure that the doors open smoothly.
ROOF VENT ASSEMBLY – see Page10
1. Page 10 of the instructions shows how to assemble the roof vent.
2. Pack 6 includes the main components required to assemble the roof vent.
3. Assemble the vent frame and the glazing as shown in Figure 6.1, Figure 6.2 and Figure 6.3
,
Figure6.4.
Make sure the bolts are the right way up.
4. Figure 6.5 Fix the casement handle to the completedvent.
5.
6.
Slide the roof vent along the groove in the ridge beam as shown in Figure 6.9
Adjust the vent and handle as required to ensure smoothoperation.
1042
(
)
1041
(
)