background image

Step 3.

 Using a 2” bolt, attach an S3B Bar to the bottom of the S2 Vertical 

Bar (Figure 2).

Step 4.

 Connect an S1L and an S1R Vertical Bar to the ends of the S3B 

(Figure 2). 

Important:

 Insert the bolt through the large hole in the 

vertical bar first, then the small hole, then the nut, so that your 
screwdriver is inside the bar when tightening. The head of the bolt 
will be flush against the inside wall of the S1L and S1R Bars when 
tightened. Attach the S3T between the S1L and S1R (Figure 1). You 
have just finished the first Side Frame.

Step 5.

 Repeat Steps 2 through 4 to assemble the second side frame, 

then firmly tighten all bolts on both Side Frames, making sure the 
bars are flush with one another. 

Important:

 Assemble both sides before proceeding.

Step 6.

 Connect the ends of an A3 Bar between the top S3T Bars (Figure 

3). The open track of the A3 Bar should face toward the ground. Insert 
the bolts through the predrilled holes in the S3T bars, then screw the 
bolts into the ends of the A3 Bar on both ends (Figure 3). Connect the 
remaining A3 Bar(s) to the S2 Vertical Bars at each tier. 

Note:

 Figure 3 

shows the 2-Tier Compact SunLite

®

 Garden only.

• 

2-Tier Compact SunLite

®

 Garden has two A3 Bars.

• 

3-Tier Compact SunLite

®

 Garden has three A3 Bars.

Step 7.

 Connect the A4 Shelf Bars to the S1L and S1R 

Vertical Bars at each tier (Figure 3). Each A4 Shelf Bar 
is box-shaped with a thin flange. Make sure the wide 
flat side of the flange is flush with the outside of the 
S1 Bars on each side and pointing toward the top of 
the unit. The box-shaped portion of the Shelf Bars 
are positioned inside to hold the Poly Trays (Figure 
3). 

Note:

 Figure 3 shows the 2-Tier Compact SunLite 

Garden only.

• 

2-Tier Compact SunLite

®

 Garden has four A4 Shelf 

Bars.

• 

3-Tier Compact SunLite

®

 Garden has six A4 Shelf 

Bars.

Step 8.

 You may now tighten all bolts on the frame, 

holding the bars in place as you tighten. With the frame 
upright, make sure all outside edges of the bars are 
flush and secure. Adjust, as necessary. 

Step 9.

 Gently lay the entire frame on its side. Place a 

Caster Insert into the bottom of all four S1 Vertical Bars. 
Firmly push a Caster into each insert until it clicks into 
place (Figure 3). Use a mallet, if needed.

Step 10.

 Stand the unit upright. Cover all the bolt holes 

with Bolt Caps (Figures 1 and 2). Place Poly Trays on 
the A4 Shelf Bars. The frame assembly is finished.

2" Bolt

Bolt Cap

2" Bolt

Figure 2

S3B

Bottom of S1 bars 
have 4 bolt holes

Side Frame Assembly — Bottom

Note: 
Larger 
hole 
faces 
outside 
of frame.

Figure 3

Caster Insert

Caster

S3T

S3T

S3B

S3B

Box side of A4 Shelf Bars 
face inside and the thin 
flanges are positioned up 
and flush with the outside of 
the frame.

Note: Illustration shows 2-Tier 

SunLite. The 3-Tier has an additional 

set of A3 and A4 parts and bolts.

Shelf Bar

Bolt Cap

Summary of Contents for SunLite 39414

Page 1: ... all parts before beginning assembly Step 1 Organize all parts on a flat clean surface All frame parts are labeled with a letter and number See parts list Use a hammer or rubber mallet to tap an End Plug into the tops of each S1R right and S1L left Vertical Bar Important note The top of the S1R and S1L Bars have bolt holes through 2 sides of the bar The bottom of the bars have bolt holes in all 4 ...

Page 2: ...R Vertical Bars at each tier Figure 3 Each A4 Shelf Bar is box shaped with a thin flange Make sure the wide flat side of the flange is flush with the outside of the S1 Bars on each side and pointing toward the top of the unit The box shaped portion of the Shelf Bars are positioned inside to hold the Poly Trays Figure 3 Note Figure 3 shows the 2 Tier Compact SunLite Garden only 2 Tier Compact SunLi...

Page 3: ... the Tubes into place Turn the Light Fixture Hood upright and remove the protective film from the black side of it Repeat Steps 1 5 for each Light Fixture Hood Ball Chain Assembly Step 1 Attach a Chain Connector to each Split Ring Figure 5 detail If necessary use needle nose pliers to pry open the Split Rings Step 2 Connect one end of a Ball Chain to the Chain Connectors on the Split Rings The las...

Page 4: ...s properly grounded If water is spilled near the power source unplug the unit before you wipe up the water Do not put objects on top of the Frame or on Light Fixture For best results attach a timer to your lights to control the length of time the lights are on and to be sure your plants get adequate light For on off manual control of your lights use the switch located on the power cord Replace the...

Reviews: