5
If you choose to vary from these instructions your
warranty will be impaired.
If you need advice, call us
FREE
on
0800 807 433
or email us at [email protected]
!
i
STEP 4:
END WALLS
1.
Cap the sloping sheets
B
with
F
1065mm channels.
2. Rivet the channels at the corners and every 2nd rib in between.
3. 2 rivets up underneath through channel into pan of sheet.
4. Perform the same again for the other end.
YOU WILL NEED:
2 full and 2
1/2
1830mm - 1770mm sloping
sheets (side walls 1
1/2
left, 1
1/2
right)
4 x 1065mm channels (2 per side)
B
F
YOU WILL NEED:
2 x ‘Z’ Door braces
Rivets for Zincalume sheds
Rivets for Colour sheds
J
J
J
STEP 5:
DOOR BRACES
1.
The door braces can be riveted now or after you have
assembled your shed.
2. Tuck one end of the ‘Z’ between the bottom channel of the
inside of the door and the sheet. Do the same at the top,
overlapping in the centre behind the padbolt.
If you have a locking ‘T’ handle you will have to run the
‘Z’s the opposite way to the diagram.
3. Rivet the ‘Z’s at the ends, and in the centre of the channel
it is tucked under, and through the overlap in the centre.
Two or three more rivets will be required through the door
sheeting into the ‘Z’, but they will need to be riveted through
from the outside of the door for a neater appearance.
4. You may need to cut or bend the flange at the bottom
and the top of the ‘Z’ if it catches on the door jamb when
opening or closing (diagram 5).
SCAN TO
WATCH OUR
ASSEMBLY VIDEO
HERE
B
F
Channels will end 15-20mm
short at tops of end walls
and 10-15mm at bottoms.
5
DIAGRAM 5
before
after
ABOVE
Z door braces in position on
the inside of door sheet
F