background image

If you feel confident that you do not need to read through these instructions, see page 2….         January 09  

 

Detailed instructions with diagrams:…. 

Fix through top and bottom of 
channels into Door jamb & spacer 

Basic overview 

of what I am trying to achieve…

 

“For those of us who do not like reading instructions….” 

Rib 
Pan 

Inside 

Outside 

1

: Front Wall 

If you choose to vary from these instructions your warranty will be impaired. 

Pg 2 

Hing

Hing

To hinge the door on the opposite 
side - simply put the top channel on 

the bottom and bottom on top. 

A.Slip (C) Corner door jamb 

under door as shown. Use (H) 
door spacer to determine the 
correct opening size by placing 
on the bottom flange of the door 
jambs. Then fit (F) channels to 

tops and bottoms of sheeting.  

Spacer 

Channel 

B. 

Outside: 

Fix channel at corners 

and every 2nd rib between and 
thru door jambs and spacer 

C. 

Inside

: One fixing per sheet at 

each end up thru channel under-
side and thru door jambs/spacer 

D.  Fit padbolt to the outside of 

door.  

Note: Higher side of 
channel goes to inside 
of shed 

Door jamb on inside 

Drawings are diagrammatic and are 
not necessarily to detail. 

Channels will come short of ends of corner 
door jamb and sheeting by 10 - 15mm on all 

panels 

Note that the cutouts go to the inside of the panel to allow 

easy fitment of end walls on assembly 

You will need: 

(C) Corner door jamb 
(D) Pre-hinged door and sheet 
(F) 

1

 top and 

1

 bottom Channel 

(H) 2 x Door spacers 

Just join the sheets together and fit the channels to the top and bottom of the sheets as a 
framing to make 4 walls and the roof. Follow these basic steps:…. 

1. 

Front  Wall

: Layout (D) door with the 715mm sheet attached. Cap the sheet with (F) channels 

(2 sided cutout - Top and 1 sided cutout - bottom). Protrude the channels out past the door. Fit 

(C) Corner door jamb with channel facing down approx 10mm past end of channels . Use (H) 

Door spacers to make sure door fits gap OK (they sit on top of the jambs) Drill & Fix (Rivet or 
screw) at every 2nd rib. Attach door spacer at each end thru door jambs and channels. 3 fixings 

underneath into sheeting pan and door jambs top and bottom. Fit padbolt.  

2. 

Back

: Join 2 (A) 1830mm Sheets together. Cap with (F) Channels and fix thru every 2nd rib 

and at least 1 fixing per sheet thru the back of the channel into the pan of the sheeting.  

3. 

Roof

Join 2 (A) 1830mm Sheets together. Cap with (E) Channels. Fix @ every 2nd rib. Attach (G) 1830 “L”s 

to ribs at each end of sheeting at corners and 600mm apart in between. 

4. 

End  walls

: Join the 2 (B) sheets together that slope the same way. Cap with (E) channels and fix at corners 

and every 2nd rib in between. 2 -3 fixings up underneath into pan of sheeting, top and Bottom. 

5. 

Assembly

: You have now made up your panels. It’s just, Join the corners and put the roof on! Make sure 

you have at least 6 fixings down each corner when you join the walls. Fix one side of the roof on thru the (G) 
“L” into the top channel on one end wall approx 500mm apart. Check overhang and fix to the other end wall. 

You now need to fix down thru every 2nd pan in the roof into the top channels on the front and back walls. 

More  in  high  wind  areas. 

Please make sure that you have removed all swarf filings as the rust spots that 

they produce may hinder any warranty claims.  

Generally most fixings are spaced at 300mm apart

 

Keep fixings in the pans as close to the ribs as possible for added strength. 

Ribs will always protrude to the outside of the shed. 

Extra

 internal fixings is strongly recommended in high wind areas. 

(F) Channels with cut-
outs (as shown). 

 

(D) 

(H) 

(H) 

If you feel confident that you do not need to read through these instructions, see page 2….         January 09  

 

2: Back Wall 

A. Join  2  (A)  sheets  together  with  2 

fixings  thru  the  overlapping  ribs 
making sure the ends of the sheets 
are flush. 

B.  Cap sheeting with (F) channels put-

ting  the  cutouts  top  and  bottom 
same as the front wall. 

C. Fix  the  channels  thru  the  end  ribs 

and every 2nd rib between. 

D. Make sure you put at least 1 fixing 

per sheet up thru the underside of 
the  channel  into  the  pan  of  the 
sheet.  

(A) 

(F) 

(F) 

(E) 

(E) 

(G) 

(G) 

You need: 

2 x (E) Channels 
2 x (A) Sheets 
2 x (G) “L”s 

(A) 

(E) 

(B) 

A. Join 2 Left (B) sheets together to give a slope at the top. 
B.  Cap sheeting with (E) 1515mm channels. 
C. Fix the channels at the corners and every 2nd rib in between. 
D. 3 fixings up underneath thru channel into pan of sheet 
E.  Perform the same again for the Right side. 

4: End Walls 

You need: 

2 x (B) Sheets - Left 
2 x (B) Sheets - Right 
2 x (E) Channels 

Door Brace Kit 

A.  The Door braces can be fitted now or after 

you have assembled your shed. 

B.  Tuck one end of the “Z” between the bot-

tom  channel  of  the 

inside

  of  the  door  and 

the sheet. Do the same at the top overlap-
ping in the centre behind the padbolt. If you 

have  a  locking  “T”  handle  you  will  have  to 
run  the  “Z”s  the  opposite  way  to  the  dia-
gram. 

C.  Fix the “Z”s at the ends and in the centre to 

the channel it is tucked under and thru the 
overlap in the centre. 2 or 3 more rivets will 

be required thru the door sheeting into the 
“Z”, but they will need to be fixed through 
from  the  outside  of  the 

door  for  neater  appear-
ance. 

D.  You  may  need  to  cut  or 

bend the flange at the bot-

tom  and  top  of  the  “Z”  if 

it  catches  on  door  jamb 
when opening or closing. 

Padbolt 

“Z” Brace 

If you choose to vary from these instructions your warranty will be impaired. 

Pg 3 

3: Roof 

Inside 

Channels will end 

15 - 20mm short 
at tops of end 
walls and 10 - 15 

at bottoms 

(E) 

You need: 

2 x (F) Channels 
2 x (A) Sheets 

A. Join 2 (A) sheets together same 

as the back. 

B.  Cap sheeting with (E) channels. 
C. Fix  the  channels  every  2nd  rib 

but not the corners at this stage 

D. Place the short flange of the “L” 

on top of the rib at 1 end. Make 
sure ends are flush with sheeting 
and put 

1

 fixing in the centre to 

hold  the  “L”.  Fix  the  corners 
thru  the  channels  and 

1

  more 

between  the  corner  and  the 
centre  fixing.  Perform  the  same 
at the other end. 5 fixings ea “L” 

Reviews: