www.hoffmann-group.com
29
4. Assembly
Assembly may be required, depending on the item.
See the descriptions below for particulars.
If an item is supplied fully assembled, turn to chapter 5. Installation.
4.1 Tools and materials required
Tool / aterial
Size / Quality
5 AF, 6 AF
17 AF
PH2
for floor anchoring (in BN25 concrete)
–
Plastic, size 8
Size: 6×50
Strength: min. 8.8
4.2 Assembly examples
Fitting wooden worktops to modular cabinets
The assembly screws supplied are screwed into the wooden worktop from
inside the cabinet.