background image

SPECIFICATION

INSTALLATION

1    

Use the supplied L-wrench to remove the four 

fixing screws  (B) of dome cover (A).

2    

Align the camera unit with the surface of the ceiling, 
make marks on the ceiling in the places where the 
screw holes are to be drilled, and then drill the four 

holes.

3    

Cut a hole (diameter2.9in.73mm) in the ceiling for 

routing 

the cables.

4  

Pass the power cable (E) and video cable (F) from the
camera unit through the cable hole in the ceiling.

5    

Align the four screw holes in the camera unit (D) with 
the screw holes in the ceiling, and then secure the 
camera in place by tightening the four or more screws 
(C) throught the washers.

6   

Carry out the settings and adjustments for the camera.

Secure the dome cover (A) by tightening the screws (B).

COLOUR VANDAL DOME CAMERA 

A

B

D

C

E

F

MODEL

General Spec

NTSC

PAL

CCD  Ty p e

1/3" 410K Pixels  Color

1/3" 470k Pixels  Color

To t a l   n u mb e r  o f   p i x e l s

811(H) X 508 (V )

795(H) X 596(V )

V i d e o   O u t p u t
Re s o l u t i o n
S / N  Ra t i o
S h u t t e r  s p e e d

1/60s  -  1/100,000s

1/50s  -  1/100,000s

S y n c   S y s t e m
W h i t e   Ba l a n c e

P o w e r  In p u t
V i d e o   O u t p u t

V o l t a g e
P o w e r  Co n s u mp t i o n

Le n s
W e i g h t

Operation tem p

In storage tem p

Operation hum idity

-20

 

 +70

Under 90

 (Non-condensing)

Me c h a n i c a l   S p e c

3.3~12 mm

1000g

-10

 

 +55

BNC Cable

El e c t ri c   S p e c

DC 12V (11 -  20V ) or AC24V (20 -  27V )
Max [LED OFF (DC12V :2.5W,AC24V :2.1W)],
Max [LED ON (DC12V :4.75W,AC24V :4.5W)]

Internal 
Auto (DIP Switc h Selec t AWC/ATW)

Co n n e c t o r

Wire

ST135-90-CB55H-CK-18IR-AC3

1.0V p- p/75 ohm Compos ite
480 TV  Lines
46dB or more(AGC off)

Reviews: