GANZ ZNT8-BA1Fxx-T Thermal Network Camera
User Manual
Precautions
Issue V1.0 (2016-02-22)
13
Figure 3-1
Installing the locating sticker
Locating
sticker
Wall
Step 2
Drill four 5 mm holes on the ceiling/wall at the positions marked by the sticker.
Step 3
Secure the bottom base onto the wall, as shown in Figure 3-2:
Figure 3-2
Bottom base
Step 4
Push the camera along to guiderail to the bottom base and rotate the camera to facilitate
wiring, as shown in Figure 3-3: