background image

 

 

Gantner Instruments Incorporated 

 

  www.gantnerinstruments.com   

 

  [email protected] 

9835 Carroll Centre Road, Suite 100                     Toll Free: (877) 725-6997 (877 QBLOXXS) 

Toll Free Fax: (800) 303-9381 

San Diego, CA  92126  USA 

                        Direct:      (858) 537-2060 

Direct Fax:      (858) 537-2064 

 

.uick Start Guide: Q.brixx Assembly and Configuration Guide 

Q

 
Purpose: This guide will describe how to put together a Q.brixx system using a test controller (i.e. 
Q.station or Q.gate) and the measurement modules. To disassemble or replace a module, simply reverse 
the procedure. 
 
Tools Required: 

-

 

Torx T10 screw driver 

-

 

2.5 mm hex key 

 
Items Required: 

-

 

Gantner test controller: Q.station or Q.gate. 

-

 

Gantner measurement module: at least one measurement module. 

 
Procedure: 
 

1.

 

Each controller and measurement module includes a base. Separate the base from the module 
by removing the 2 x Torx T10 screws from the back of the base. 
 

2.

 

A controller in the brixx packaging comes with 2 x handles (a left side and a right side). Attach 
the left side handle to controller’s base. 

 

 

3.

 

Attach all the bases together moving from left to right. Secure the bases together using a 2.5 
mm hex key (2 x screws): 

 

Reviews: