3
TABLE OF CONTENTS
Unit Assembly
3
What is Blood Pressure
4
How to Take a Reading
6
Quick Reference Guide
10
Care and Maintenance
11
Warranty
11
Technical Specifications
12
UNIT ASSEMBLY
Lay out the parts as pictured. The cuff should already be folded
through the metal D-ring. If the cuff is not pre-folded, lay the cuff flat
in front of you. Place the metal D-ring on your left. Pull the end of the
cuff through the metal bar. If you fold the cuff correctly, the hook and
pile material faces the outside of the cuff loop.
Look at the drawing to help you put the unit together.
1. Attach the gauge to the tubing on the left.
2.
Attach the inflation bulb to the tubing on the right.
3. Attach the single end of the Y-tubing to the stethoscope chest-
piece
4. Attach the double end of the Y-tubing to the binaural.
Summary of Contents for 700K
Page 1: ...INSTRUCTION MANUAL...
Page 14: ...14 700K...
Page 15: ...15 15 16 17 22 23 24 24 1 2 3 4 Y...
Page 16: ...16 25 4 40 6 126 76 126 76 126 76...
Page 17: ...17 1...
Page 18: ...18 2 2 3 1 2 4...
Page 19: ...19 5 6 1 2 7 1 2 Y...
Page 20: ...20 8 9 30 280...
Page 21: ...21 10 2 4 11 12 2 4...
Page 22: ...22 13 5 1 2 5 3 4 30 1 2...
Page 23: ...23 3 30 40 4 5 2 4 1 5...
Page 24: ...24 18 700K 537 200 120 75 20 70 100 25 5 40 5 40 20 300 2...
Page 25: ...25 3 60 240 4 20 60 240 300 3 2 1 2 25 4 40 6 3 4 5 6 1...
Page 26: ...26 700K...
Page 27: ...27 27 28 29 34 35 36 36 1 2 3 Y...
Page 28: ...28 4 Y 25 4 40 6 126 76 126 76 126 76...
Page 29: ...29 1...
Page 30: ...30 2 2 3 1 2 4...
Page 31: ...31 5 6 1 2 7...
Page 32: ...32 8 9 30 280...
Page 33: ...33 10 2 4 11 12 2 4...
Page 34: ...34 13 5 1 2 5 3 4 30 1...
Page 35: ...35 2 3 30 40 4 5 2 4 1 5...
Page 36: ...36 18 700K 537 200 120 75 20 70 100 25 5 40 20 300 2...
Page 37: ...37 3 60 240 4 20 60 240 300 3 2 1 2 25 4 40 6 3 4 5 6 1...