User manual
56
Chapter 3 Usage
Commisioning
•
Clean the appliance befor commissioning. For further details see
maintenance.
•
After the installation, wait at least 2 hours before starting the appliance.
•
Plug into a grounded outlet.
Thermostat
ECO-line plug ready cabinets (type E1 en E2) are equiped with an electronic
thermostat.
Operating the thermostat
For operating the thermostat and chancing its parameters, please see the attached
thermostat instructions.
Summary of Contents for E1/22MU
Page 2: ......
Page 3: ...3 Inhoudsopgave 4 Table des mati res 26 Content 46 Inhaltsverzeichnis 66 NL FR UK D...
Page 22: ...Gebruiksaanwijzing 22 EG verklaring...
Page 25: ...25...
Page 42: ...Manuel d utilisation 42 D claration CE...
Page 45: ...45...
Page 62: ...User manual 62 EC declaration...
Page 65: ...65...
Page 82: ...Gebrauchanweisung 82 EG Konformit terkl rung...
Page 85: ......
Page 86: ......
Page 87: ......