background image

 

 

Version 1, 15 June 2020, Page 

16

 of 

16

 

Galvin Engineering Thermostatic Mixing Valve or 
Tempering Valve Commissioning/Maintenance Report 

 

The following information is to be provided by the site manager/owner/occupier. 

Valve size and installation recommended by : ______________________________________________________ 

Valves supplied by: ___________________________________________________________________________ 

Date of Installation: _________________________________  Drawing No. _______________________________ 

Service Manual on Site:  

 

 

Yes  

  

No 

□ 

 

Commissioning Tests for new installation or valve replacement.  Yes 

 

This set of testing procedures and report received and witnessed by (Print Name): _________________________ 

___________________________________________________________________________________________ 

Temperature setting at completion of commissioning _______________ C 

Position: ________________________________Signature: ______________________ 
Date:_______________________ 

 

Maintenance Tests.  Yes 

 

Date of Previous Service:  ______________________________________________________________________ 

Previous Service carried out by:  _________________________________________________________________ 

Reason for Maintenance Tests:  _________________________________________________________________ 

This Test and report Witnessed by: _______________________________________________________________ 

The valve has been operating/performing satisfactorily for the previous 12 months:  

Yes 

   

No 

 

Comment on monthly Temperature Tests carried out by the owner______________________________________ 

___________________________________________________________________________________________ 

Temperature setting at time of completion: _________C 

Current Report received and witnessed by: 

Name: _____________________________________________________________________________________ 

Position: ____________________________________________________________________________________ 

Signature: _____________________________ Date: _______________________________________________ 

 

Summary of Contents for CliniMix Lead Safe TMV SS

Page 1: ...ng tempered water to the desired outlets This stainless steel hinged cabinet kit is a lockable cabinet with 20mm copper fittings 2 in and 1 out which allows secure installation and safe simple mainten...

Page 2: ...es 3 0 DESCRIPTION This manual covers the CliniMix Lead SafeTM TMV SS Cabinet Assembly with Universal Door 20 Bottom In Out These are designed to provide tempered water to the desired outlets This mix...

Page 3: ...APH The Galvin Engineering CliniMix Thermostatic Mixing Valve is suitable for many applications The Head loss Characteristic for Mixed Outlet Flow rate versus Balanced Inlet Pressure is shown below in...

Page 4: ...ction within specification on unequal pressures up to 6 1 The mixer has integral isolating valves which permit servicing of the strainer check valve flow regulator and thermostatic cartridge They are...

Page 5: ...ure to do this may void the warranty 3 Connect water lines Before connecting to water lines all lines must be flushed Remove protective vinyl cap from copper tubes Join each copper tube to the correct...

Page 6: ...rtest length of pipe work between the mixing valve and outlet fixture Allow the mixed outlet to flow for at least 60 seconds to allow the temperature to stabilise before taking a temperature reading a...

Page 7: ...Restore the cold water to the TMV After the mixed water temperature has stabilized note the outlet temperature ensuring the outlet temperature has reestablished Now repeat the above test except this t...

Page 8: ...st plugs in the top of the inlet fittings are tight and that there is no evidence of water leakage The TMV must then be recommissioned as per Section 7 0 including temperature adjustment and the shutd...

Page 9: ...rass top assembly screw out the plastic spindle and replace the smaller O ring 5 Carefully remove the spindle from the center of the body 6 Remove O ring from spindle Replace with O ring supplied in t...

Page 10: ...OR WM TMV1 1 2 WM ISO 1 INLET ISOLATOR ELBOWS PAIR FOR WM TMV1 1 3 WM NRV 1 INLET NON RETURN VALVE FOR WM TMV1 PAIR 1 4 WM STR 1 INLET STRAINERS FOR WM TMV1 PAIR 1 5 WM TPKIT 1 THERMOSTAT PISTON SHUTT...

Page 11: ...r s recommendation the ode and all relevant statutory and local tate or erritory requirements 4 The TMV must be returned to Galvin Engineering together with a fully and correctly completed Galvin Engi...

Page 12: ...ntrol valves to ensure inlet conditions are within range Clean strainers ensuring debris is removed Either full hot or cold flowing from the outlet fixture Valve is incorrectly set Hot Cold water has...

Page 13: ...___________________ Model No ________________________ Size _________ Valve Location Building _____________________________________________________________________ Valve Identification No _____________...

Page 14: ...k It is hereby certified that all the commissioning work has been carried out by the undersigned in accordance with the requirements of the Codes of Practice indicated prior Date of Valve Commissioned...

Page 15: ...Outlets in Use One Outlet in Use All Req d Outlets in Use 1 2 3 4 5 6 7 8 9 10 11 Give details of brand and model designation Commensurate with the design flow rate for the mixing valve Note An accura...

Page 16: ...e ______________________ Date _______________________ Maintenance Tests Yes Date of Previous Service ______________________________________________________________________ Previous Service carried out...

Reviews: