background image

 

© Galvin Engineering Pty Ltd 

 

 

Product Installation Guidelines 

Document Number: 001.00.70.13 

 

Version 1, 4 November 2022, Page 

2

 of 

4

 

 

INSTALLATION

 

IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions and 
in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply 
conditions  must  also  comply  to  the  applicable  national  and/or  state  standards.  Failing  to  comply  with  these 
provisions shall void the product warranty and may affect the performance of the product. 

 

Note: Tapware body used as an example only. SBAs can fit on different kinds of Ezy-Wash bodies. 

  

1.  Remove Handle 

 

Prior to installation turn off the water supply

 

Remove the handle assembly. To prevent 
damage, carefully pry off plastic indicator from 
the handle. (Use a small flat bladed screwdriver 
if necessary).

 

 

2.  Replace spindle assembly 

 

Unscrew the head part from the threaded sleeve 
using a 17mm spanner.

 

 

Check seat inside tap body for pitting or damage. 
Re-seat if necessary

 

 

3.  Refit new head 

-

 

Refit new head into tap body. 

 

Note: do not tighten cartridge using the 
handle as this will result in damage to the 
cartridge

 

 

4.  Reassemble Handle 

-

 

Refit  adaptor  and  reassemble  handle  by 
reversing step 1. 

-

 

When installation is complete, slowly open 
water supply and inspect for leaks. 

 

New ceramic head

New head 

Reviews: