INSTALLATION PROCEDURE

 

Refer to Installation Drawing for clarification. Check parts list to ensure all required 
parts are included. Use an AS 4020 approved pipe joint sealant on all connections. 

 

STEP 1: 

Prepare the emergency shower foundation by using the floor flange as a 
template. Locate the three holes for the 3/8-

16 UNC x 6” anchor bolts. (Not 

supplied). They should extend 

1” above the floor level. 

STEP 2: 

Once the concrete foundation is ready (dry), assemble the floor flange to the 
anchor bolts; then securely fasten with 3/8-16 UNC Hex nuts and 

3/8” 

washers (Not supplied). Seal and tighten floor flange and (1-

1/4”) tee making 

certain the waste tee is facing the proper location and the foot control holes 
are facing side to side. 

STEP 3: 

Assemble nipple (1-

1/4” x 33”) to the tee and tighten with a pipe wrench. 

STEP 4: 

Assemble in the following order: 
Attach intermediate coupling to nipple (1

-

1/4” x 33”) 

Attach plugged nipple (1-

1/4” x 24”) and tee (1-1/4”) onto the coupling. 

Attach nipple (1-

1/4” x 24”) onto the tee. 

Attach tee (1-

1/4” x 1-1/4” x 1”) onto nipple. 

Attach nipple (1” x 9”) valve assembly onto tee (1-1/4” x 1-1/4” x 1”)  
Attach street elbow 

(1”) and nipple (1” x 12-1/2”)  

Attach nipple onto valve. 

STEP 5: 

Attach the showerhead onto street elbow (1”). 

STEP 6:   

Assemble the sign onto the unit. Use the strap, screws, washers and nuts 

provided  to  mount  the  sign  onto  the  upright.  The  sign  should  be 
positioned for maximum visibility. 

STEP 7: 

Insert the plug into the optional supply line tee that is not used. Before 
connecting the supply water line to the emergency shower;

 CHECK IF THE 

ASSEMBLY IS RIGIDLY TIGHTENED AND FLUSH THE LINE 
THOROUGHLY.

 

 