Revision 4
18
August 02, 2019
g) Remove the plastic wrap from the analyzer system to gain access to the doors of the
cabinets.
h) Open the cabinet doors and
carefully
remove the packing material from inside each of
the two (2) analyzer cabinets.
Care should be taken while removing the cabinet packing material so that
no hardware or wiring is damaged.
i) Inspect the internal equipment to ensure that no damage has occurred and that no
components have become loose during transport.
If any damage is visible contact Galvanic Applied Sciences Inc. immediately and do not
proceed with the system installation. Do not attempt to facilitate repairs yourself as this
will negate and/or invalidate any possible insurance claim or equipment warranty.
j) If no damage is apparent, the analyzer system is ready for transport to the installation
(sample point) site. The analyzer system framework has two (2) lifting rings located at the
top. Installation of proper clevises is recommended. The lifting rings are rated for
approximately 227 kg / 500 lbs per ring.
2.4 Installation Steps
Installation of the 943-TGX analyzer system consists of the following steps
•
Mounting of the Analyzer System (Section 2.4.1)
•
Mating of the Process and Analyzer System Flanges (Section 2.4.2)
•
Connection of the AC Power Service (Section 2.4.3)
•
Connection of the Analog Signal Cables (Section 2.4.4)
•
Connection of the Digital Signal Cables (Section 2.4.5)
•
Connection of the Instrument Air Services (Section 2.4.6)
•
Connection of Steam (Section 2.4.7)
•
Connection of the ‘Loss of Purge Signal’ (Section 2.4.8)
The user should read each step and make certain that it is fully understood
before proceeding to installing the analyzer.
2.4.1 Mounting of the Analyzer System
The framework that is used in the analyzer system must be securely attached to a support
structure provided by the end user. The support structure must be positioned so that when
the analyzer framework is bolted in place, the flange of the analyzer cabinet and the process
sample access point are correctly aligned. The plant support structure should be suitable for
mounting the analyzer frame as shown in the Mounting drawing (Figure 2-1). An overview of
the service connections is presented in Figure 2-2.
The steam jacketed ball valve must be installed on the process sample point before mounting
the analyzer system.
Summary of Contents for 943-TGX
Page 48: ...Revision 4 48 August 02 2019 Figure 4 13 Network Sub Panel...
Page 94: ...Revision 4 94 August 02 2019 Figure 9 3 Control Cabinet Detail...
Page 96: ...Revision 4 96 August 02 2019 Figure 9 5 AC Wiring Diagram...
Page 97: ...Revision 4 97 August 02 2019 Figure 9 6 DC Signal and Wiring Diagram...
Page 98: ...Revision 4 98 August 02 2019 This Page Intentionally Blank...