
XYJGT90100TVE-001
44
and take out the
balancer
2. Remove the
upper balancer to
be handled gently to
avoid damage
3. Pull out the water
level switch terminal
4, 5 and 6, turn the
water level switch
90 degrees, remove
the water level
switch
may cause alarm
拆除减震销和排水软管
Remove absorber pin and drain hose
1
、用平口钳夹紧减
震销卡口位置
1
、
2
、
3
同时把减震销退出
来
2
、用平口钳夹紧排
水软管管夹
4
同时拉
出
1. Clamp the
absorber pin
position 1, 2 and 3
with the
combination pliers
and then exit the
absorber pin
2. Clamp drain hose
clip 4 with
combination pliers
and pull it out
拆除外桶组件
Remove tub as
使用工具
i
t
l
13
号外六
角套筒
13 outer
hexagon
sleeve
电批
electric
screwdriver
平口钳
combination
pliers
使用工具
using tools
3
1
2
4