Combustion Tests
Combustion tests must be carried out using an approved test kit.
The householder should be left necessary details of the test.
To obtain the above, first fit a manifold and pressure gauge 0-300 p.s.i. to the oil pump.
Next set the Boiler control stat to 80°C and switch on. Ensure all controls are calling for
heat.
Having bled the air out of the system, adjust the pump pressure.
Test holes are provided for all flues.
Check the smoke reading with the Boiler up to temperature and then measure the CO² and
flue gas temperature.
Reducing air into the burner decreases the flue gas temperature and increases the CO².
See Section 11 for typical burner settings and test data.
IMPORTANT
DO NOT drill any test holes in balanced flues.
ALWAYS refit test hole bolts.
8-5
Handing Over
Having filled in the guarantee form, this should be sent to GAH (Heating Products) Limited.
The installer should next recheck the system and ensure it is completely satisfactory
before demonstrating to the householder the operation of the Boiler and its controls.
The manual must be left with the householder together with a copy of the completed
warranty form.
Also leave the Burner Booklet with the householder and any other manufacturer’s
instructions or details supplied with components.
8-3
Extra Procedures for External Boilers
8-3.1 Frost protction
Check that the Boiler frost stat is wired correctly.
Check all pipework is adequately insulated.
8-3.2 Rodent Protection
Check that all holes in the Boiler casing have been plugged or covered.
Check that cables to the Boiler are protected - metal conduit is recommended.
Plastic plumbing pipe is not recommended for outside use.