11
Installation
Installation preparation
1
Mark a vertical center line on the wall from the
ceiling to the lower edge of the extractor hood.
2
Mark positions for the screws and the contour of
the attachment area.
3
Drill holes for the fixtures and press in the wall
plugs flush with the wall.
$$
ʌ¼ʓʘ
èè¼ʓʘ
èè¼ʓʘ
PP
ë
ʎ¼ʚ
PLQ
è¼ʓʘ
ʌ¼ʓʘ
ʌ¼ʓʘ
ʎ¼ʓʘ
ʎ¼ʓʘ
é
ʎ¼ʚ
ê