
Lead Gage Operation Manual
Model LG-5003
Copyright © 2014 Gagemaker. All rights reserved
17
Replacing the Indicator (continued)
11. Place the lead gage on the proper lead gage
setting standard.
12. Using a
⅛
” hex wrench, turn the indicator
adjustment screw in the gage’s handle
clockwise until the indicator travel reaches the
maximum limit.
13. Loosen the indicator clamp and rotate the
indicator bezel to align the indicator needle with
–10 to give the gage the proper preload.
14. Turn the
⅛
” hex wrench counter clockwise until
the indicator needle aligns with zero. Pull back
slightly on the indicator if necessary.