
B
B
X
X
/
/
B
B
X
X
G
G
-
-
1
1
0
0
0
0
0
0
S
S
e
e
r
r
i
i
e
e
s
s
G
G
r
r
o
o
o
o
v
v
e
e
M
M
e
e
a
a
s
s
u
u
r
r
e
e
m
m
e
e
n
n
t
t
G
G
a
a
g
g
e
e
O
O
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
M
M
a
a
n
n
u
u
a
a
l
l
19
Operating Procedures
Inspecting Parts with the BX-1000 Gage
Materials Needed:
•
BX-1000 gage
•
Inspection report
•
Part
4. After zeroing the BX-1000 gage, position the
gage on the flange face and into the ring
groove of the part.
5. Properly position the contact points in the
groove, as shown to the right.