If the electronic governor system fails to operate and the actuator is suspected, the following tests can determine the integrity of the 

103 Series actuator.

Check the resistance of the coil by disconnecting the actuator from the control unit and connecting your meter to the ends of the wires 

coming from the actuator.  This resistance should be approximately:

1.  Remove the actuator from the pump. 
2.  Hold the actuator with the lever side down.  
3.  Manually move the actuator’s shaft through its entire range of motion by depressing the actuator lever.  You should not feel any 

binding or sticking.  

4.  Energize the actuator to full fuel (follow steps in speed control publication) while observing the movement of the lever.  
5.  The actuator should operate smoothly throughout its entire stroke without any interruptions in motion. 
6.  If the 103 Series actuator passes these tests, the problem is likely elsewhere in the speed control unit, speed sensor or fuel system.  

Refer to the speed control unit troubleshooting publication or fuel pump information.

6

TROUBLESHOOTING

B - SERIES

L-SERIES

2.3 Ω 

12 V DC

7.8 Ω 

24 V DC

5.3 Ω         12 V DC

Before starting this procedure, make sure that the upper sur-

face of the pump is clean of all dirt and grime.  Do not force or 

over-tighten any connections while completing this procedure.  

1.  Check the clearance on the Overshoot Protection Screw. 

This screw may need to be replaced with a shorter screw.  

A 10 mm M6 screw is recommended.  This will provide 

the adequate clearance needed to install the 103 Series 

actuator. 

2.  Adjust droop by loosening the locking-bolt and turn the 

Droop Control allen screw CW until it cannot be turned 

any further.

3.  Adjust the Allen Screw in a counter-clockwise direction 

one and half turns and tighten lock nut.

4.  Set the no-load engine speed to 1950 RPM by loosen-

ing the Trunnion (Locknut) and adjusting the Speed Set 

Screw. This adjustment requires turning the Speed Set 

Screw approximately nine turns clockwise.  

5.  Once you have the engine running at 1950 RPM, shut the 

engine down and disconnect the starter-motor from the 

battery.

5

WIRING

The 103 Series Electric Actuator is designed in both a 12 V DC or 24 V DC (B-Series) and the a 12 V DC L-Series.  These actuator 

models are identified in Chart A.  You must be sure that the actuator voltage matches the battery supply voltage when ordering the 

actuator. An actuator cable harness is used to connect the 103 Series actuator to the selected GAC speed control unit.  There are no 

polarity connections from the speed control unit to the actuator which need to be observed. For more information on additional wiring, 

see installation manual for your specific to the speed control unit.

 PREPARING THE FUEL PUMP

 MEASURE COIL RESISTANCE at ROOM TEMPERATURE

 MEASURE COIL ISOLATION

Check the resistance from one wire to the housing of the actuator, then from the remaining wire to the housing.  In both cases you 

should get a reading  >1M Ω 

 CHECKING FOR PHYSICAL OBSTRUCTION