GABRIEL KERAMIK AB
8 • STUDIO2
3
250 mm
4
406 mm
3 2 8 m m
3
4
5
2
Assembly
Set the firebox block (2) with
mortar.
Mark the centre line on the first
block, it will help you to position
the opening and the soot hole
correctly.
Set the outer block (3) with mortar.
The opening shall face the 45°-
marking on the floor (step 1).
Seal with insulation where
indicated.
Set the outer block (4) with mortar,
level the soot hole with the previous
block. Level vertically and horizon-
tally.
For a better joint, wipe the
contact surfaces with a
squeezed sponge, then
brush with a wet radia-
tor brush. This is a general
instruction for the whole
assembly.