GABRIEL KERAMIK AB
STUDIO2 • 13
17
18
11
7
7
17
18
19
Assembly
Set the “church roof” (11).
Level vertically and horizontally.
Seal with 2-3 mm insulation.
Set the outer block (7) in mortar.
Level vertically and horizontally.
Make sure that no mortar
falls between the firebox
block and the outer block.
Set the outer block (7) in mortar.
Level vertically and horizontally.