2
1
1
2
1
2
When the pump function is off
Find the position of water outlet, také down water cover, pull down the water plug.
Connect the pipe with 13 mm diameter/garden pipe.
Note:
The length of drainage pipe shall not be too long (suggest less than 60 cm), the end of drainage
pipe shall be lower than the outlet for at least 10 cm and keep it straightened out.
2
1
1
2
1
2
2) When the pump function is on
Find the position of water outlet, také down water
cover, pull down the water plug.
Connect the pipe with 5 mm diameter.
Connect the pipe before turning the pump
function on to prevent water leakage.
2
1
1
2
1
2
Summary of Contents for Impact 40
Page 1: ...HU PL SK DE EN CZ Manual DEHUMIDIFIER G21 Model Impact 40 ...
Page 2: ......
Page 86: ......
Page 87: ......
Page 88: ......