USE AND INSTALLATION MANUAL
edition: 1/05.10.2020
Page
7
of
10
d)
Secure tripod legs against accidental moving apart with
a chain. Chain ends must be connected with a
carabiner. The chain should be well tensioned between
tripod legs. If necessary remove any excess clearance.
Instead of chain, special strip (delivered with tripod)
can be used.
e)
To fold the tripod, remove steps, pull out cotter bolts
and fold the legs.
10. INSTALLATION OF WORK ROPE OF DEVICE
INSTALLED ON TRIPOD LEG
a)
Pull out adequate work rope length from the device
and mount the rope on the roller integrated with the
head. Check whether work rope is fitted correctly on
the roller.
b)
Attach energy absorber SDW at the end of work rope
of rescue devices RUP502-U, RUP503-U, RUP504,
RUP506.
11. INSTALLATION OF PERSONAL
FALL PROTECTION EQUIPMENT
Personal fall protection equipment can be connected to
three anchor points located on side platens of the head.
E.g. CR / WR retractable type fall arresters.
12. INSTALLATION OF UNIVERSAL HOLDER
UTB (AT017-300)
See: UTB instruction manual.
13. INSTALLATION OF RESCUE DEVICES
See: UTB instruction manual.