
43
SUPERBOILER T5
Original Instructions—rev.2011—
In compliance with the step 1.7.4 of the Machinery Direc-
tive 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25046
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Assemble back on the vane abutment nut and the vane abutment ring with a clockwise rotation.
In the rear part of the locking device you shall now insert the stem and the grub screw as shown in the pictur
making sure not to move the expansion shaft.