
31
SUPERBOILER T5
Original Instructions—rev.2011—
In compliance with the step 1.7.4 of the Machinery Direc-
tive 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25046
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Screw the vane expansion nut all the way down.
Insert the expansion shaft and screw it counter
-
clockwise until its tip extends 20mm outside as shown in the
picture.