16
MINI K
Original Instructions—rev.2011—
In compliance with the step 1.7.4 of the Machinery
Directive 2006/42/CE
G.B.C. Industrial Tools S.p.A.
Via Sandro Pertini 41/43 –
25046
Cazzago San Martino (Bs) –
Italia –
Tel. + 39 030 7451154 –
Fax. + 39 030 73 56 629
Put back the
VANE EXPANSION NUT
and torque ir.
While keeping the machine in axis with the pipe, insert the
SHAFT in the pipe
(about 15
-
20mm)
Firmly screw clockwise the
VANE EXPANSION NUT.
This will cause the expansion of the locking jaws and will have the machine to achieve a stable grip.