![Fypon Beam Mantel Hand Hewn Installation Instructions Manual Download Page 10](http://html1.mh-extra.com/html/fypon/beam-mantel-hand-hewn/beam-mantel-hand-hewn_installation-instructions-manual_2352996010.webp)
Beam Mantel
Installation Instructions
fypon.com
10
Beam Mantel Testing
Fypon
®
polyurethane Beam Mantels were tested to ASTM D1929 – IGNITION TEMPERATURE EVALUATION ON
BEAM MANTEL POLYURETHANE FOAM USING FOAMRESIN-R MATERIAL, and shown to be safe from ignition
at a temperature of 300 degrees Celsius or 572 degrees Fahrenheit. As a comparison, wood (soft woods, such
as pine, cedar, redwood, fir, poplar, etc.) will ignite at 180 degrees Celsius or 300 degrees Fahrenheit.
Weight Load Capacity
Testing by a third-party lab showed a weight load capacity of up to 200 lbs.
Fire Code Information Using Fypon Beam Mantels
Refer to International Residential Code Information for Fireplace Mantels; Section R1001.11 Fireplace Clearance
and National Fire Code Information for Fireplace Mantels.
General Installation Notes
Any adhesives, sealants, fillers or paint used must be compatible with the material that is being installed (see
manufacturer’s recommendations in the Finishing and Adhesives section below). Always use corrosion-resistant
mechanical screws along with manufacturer’s recommended adhesive product when installing all Fypon products.
This combination provides a secure, long-lasting bond. Countersink all fasteners about 1/8" and fill with product
compatible filler. Exterior installations should be finished using a manufacturer’s recommended caulk to prevent
water infiltration behind siding, windows and doors.
Finishing and Adhesives
Fypon polyurethane products are factory primed. Depending on product location, always use interior / exterior-
grade PUR compatible adhesives, sealants and fillers when installing Fypon products. Consult the manufacturer’s
recommendations for your particular climate and the substrate you are installing to.
IMPORTANT
Please read these installation guidelines thoroughly before beginning installation. Please note that these guidelines are provided only to assist
with the installation of Fypon millwork products. Modified procedures may be required in order to meet specific situations, unique applications
and local building codes. The manufacturer does not, under any circumstances, warrant the installation of its products. Be sure to wear
appropriate protective clothing, gloves and safety glasses when working with any tools. Installer should check for and relocate all electrical
wiring within the proposed installation area, as needed (be sure to disconnect all electric power before working with any electrical wiring and
follow all applicable local electrical codes and safety procedures).
Fig. 19
Fig. 20
Fig. 21