17 |
P a g e
Fit the turbine to the top of the tower and secure using the two grub screws that clap the tower
tube – use thread lock adhesive on the grub screw threads.
Before lifting the complete tower and turbine assembly ensure all guy ropes are attached, only the
gin pole bolt should need to be attached when raised. Be aware that the tower now has an extra
22Kgs on the top so lifting will be more difficult, however if all the procedures in these instructions
have been followed raising the tower will be straight forward without risk of injury or damage to the
product.