WC ORION III ENGLISH CDN 1230 REV01.DOCX
21
ORION III
DUAL SWINGAWAY AND HANGER
1. Installation
a. Position the center pivot of the swingaway footrest (C) onto the hanger (B)
with the swingaway footrest facing out from the wheelchair.
b.
Swing the footrest inwards such that the swingaway latch (A) ‘clicks’ into
place onto the hanger block.
2. Removal
a. To remove the footrest, pull up onto the handle latch (A) releasing the
mechanism from the hanger and swing the footrest outwards or inwards.
b. Pull up on the footrest to remove from wheelchair.
3. Height Adjustment
a. Remove bolt (D) which holds the extension tube in place.
b. Slide the footrest extension tube up or down to the desired height. Note a
minimum o
f 2” should be kept between the footplate (E) and the floor.
c.
Re-install and tighten the bolt (D) in place.
6
Summary of Contents for Orion III
Page 1: ...OWNERS MANUAL...
Page 25: ...WC ORION III ENGLISH CDN 1230 REV01 DOCX 25 ORION III FRONT SEAT TO FLOOR SET UP CHART...
Page 26: ...WC ORION III ENGLISH CDN 1230 REV01 DOCX 26 ORION III...
Page 38: ...WC ORION III ENGLISH CDN 1230 REV01 DOCX 38 ORION III...
Page 39: ...WC ORION III ENGLISH CDN 1230 REV01 DOCX 39 ORION III...
Page 49: ...WC ORION III ENGLISH CDN 1230 REV01 DOCX 49 ORION III...
Page 50: ...WC ORION III ENGLISH CDN 1230 REV01 DOCX 50 ORION III...
Page 51: ...WC ORION III ENGLISH CDN 1230 REV01 DOCX 51 ORION III...
Page 52: ......