Installation: 

Stage  4 

Page 8 of 22 // email [email protected]  tel: +44 (0) 1438 833577  fax: +44 (0) 1438 833565

SPS 800 / 1200 - Sliding Panel System Plasma Advance

Positioning The Moving Panel Mechanism

Before the mechanisms can be fitted, it is important to decide on the exact positions
where they need to be. 
Make sure that you have the mechanisms in the down and in position at this point.

Place one of the moving panel mechanisms
on the side of the enclosure. Raise the
mechanism until the mounting plates are
roughly in the middle of the screen position.

With the mechanism in place, measure the
height that is needed to achieve this position.

The mounting plates
need to be positioned
roughly in the middle
of where the screen /
opening is located

Roughly

4mm

Mechanism

Height Needed

Summary of Contents for SPS 1200

Page 1: ...1438 833565 ISSUE 008 InstallationInstructions SPS800 1200 SlidingPanelSystem PlasmaAdvance Design Highlights Range of Single Panel and Split Panel Options Space Efficient Design Wide Range of Cabinet...

Page 2: ...acity can result in serious personal injury or damage to equipment Future Sound Vision trading as Future Automation intend to make this and all documentation as accurate as possible However Future Aut...

Page 3: ...hecks 5 Stage 2 Before you Begin 2 6 Electrical Connections 6 Stage 3 Mark the Screen Position in the Enclosure 7 Stage 4 Positioning the Moving Panel Mechanism 8 Stage 5 Fitting the Moving Panel Mech...

Page 4: ...ct your statutory consumer rights The following is excluded from warranty service Malfunctioning caused by misuse or damage accidental or otherwise or service modification by persons not authorised by...

Page 5: ...for your screen Your pack may also contain a custom adapter if your screen is not VESA compatible Parts not to scale Package Contents 1 Panel Mechanism Right 2 Panel Mechanism Left 3 Drive Unit 4 Plas...

Page 6: ...hem Plug the units together with the leads from the control box The panel mechanism connection can be found tucked in one end of one of the mechanisms See sheet 3 for further details of the electrical...

Page 7: ...y function Installation Stage 2 Page 6 of 22 email info futureautomation co uk tel 44 0 1438 833577 fax 44 0 1438 833565 SPS800 1200 SlidingPanelSystemPlasmaAdvance It is VERY important that when all...

Page 8: ...nclosure Firstly mark where you intend the top of the plasma screen to be on the back wall of the enclosure Then mark a line showing where the centre of the screen opening will be It may be helpful to...

Page 9: ...ey need to be Make sure that you have the mechanisms in the down and in position at this point Place one of the moving panel mechanisms on the side of the enclosure Raise the mechanism until the mount...

Page 10: ...ck of wood knowing they are both at the correct height alternatively 2 screws can be used Fitting The Moving Panel Mechanism The moving panel mechanisms should be positioned roughly 4mm in from the ed...

Page 11: ...ith nuts through both these joints both ends From the pre test earlier you should be able to make sure the shafts are not 180 degrees out of sync at this stage The drive unit is a telescopic piece of...

Page 12: ...k of the Screen Image shows where to measure From this measurement it is possible to determine where to drill the holes in the wall Measure the distance from the top of the screen down to the centres...

Page 13: ...t that you took in the previous stage You can also mark where the sides of the wall plate need to be The holes are 170mm apart so mark two vertical lines 85mm to each side of the centre line you marke...

Page 14: ...of the Plasma Advance Unit can slide up and down the channels Firstly operate the Plasma Advance Unit so that it is in the OUT position This should make it easier to determine where the mechanism need...

Page 15: ...To connect the three mechanisms together electrically is very simple Each mechanism has a set of wires coming from it On the ends of the wires are control box inserts and block connectors These wires...

Page 16: ...Plates Following fitting the mounting plates it is a good time to set the mechanism is still operating correctly Use the supplied IR remote to control the mechanism The mounting plates fix to the runn...

Page 17: ...dvance BACK PANEL Mounting Plate Height 5mm Clearance Mounting Plate Height Fix the front panel to the enclosure Measure the height of the panel mounting plates from the bottom of the opening Remove t...

Page 18: ...ote control and wait for the Plasma Advance mechanism to reach its pre set out position Once out press B on the remote control repeatedly to pulse the mechanism out until the frame is extended fully T...

Page 19: ...ndicators 568A 568B 1 12V SUPPLY 12V SUPPLY CURRENT LIMITED W G W O 2 12V LATCH When 12V attached device will go OUT When 12V removed device will go IN G O 3 GROUND GROUND W O W G 4 PIN 4 NOT USED BL...

Page 20: ...se an RJ25 connector in the socket marked RS232 on the control box to operate using RS232 Details Baud rate 9600 Stop bit 1 Parity None Databits 8 Pin 1 RX Pin 6 TX Pin 3 4 GROUND Pin 2 TX Pin 3 RX Pi...

Page 21: ...roller needs x2 AAA batteries which are provided within the packaging Replacing batteries OUT Panel moves in and up and screen moves OUT to fill space IN Screen moves back IN and panel moves down and...

Page 22: ......

Page 23: ...Page 22 of 22 email info futureautomation co uk tel 44 0 1438 833577 fax 44 0 1438 833565 SPS800 1200 SlidingPanelSystemPlasmaAdvance Notes...

Page 24: ...e Automation Unit 2 Kimpton Enterprise Park Claggy Road Kimpton Hertfordshire SG4 8HP United Kingdom Tel 44 0 1438 833 577 Fax 44 0 1438 833 565 Email info futureautomation co uk www futureautomation...

Reviews: