Installation:
Stage 4
Page 8 of 22 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
SPS 800 / 1200 - Sliding Panel System Plasma Advance
Positioning The Moving Panel Mechanism
Before the mechanisms can be fitted, it is important to decide on the exact positions
where they need to be.
Make sure that you have the mechanisms in the down and in position at this point.
Place one of the moving panel mechanisms
on the side of the enclosure. Raise the
mechanism until the mounting plates are
roughly in the middle of the screen position.
With the mechanism in place, measure the
height that is needed to achieve this position.
The mounting plates
need to be positioned
roughly in the middle
of where the screen /
opening is located
Roughly
4mm
Mechanism
Height Needed
Summary of Contents for SPS 1200
Page 22: ......