In
st
al
la
ti
o
n
:
S
ta
ge
3
Page 7 of 18 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
PD3.5 - Projector Drop Mechanism
MAKE SURE THE
BOTTOM PLATE IS
REMOVED SO YOU
CAN ACCESS THE
FIXING HOLES!
Installing of the unit into the ceiling
-Remove the base plate by sliding
forward then lowering through the key
hole details
-ORGANISE THE CABLES READY
TO THREAD THROUGH THE
CABLE HOLES ON THE SIDE OF
THE UNIT!
-Secure into place using screws
through the fixing holes x10 total
-Check the mechanism and
movement of the unit
- Cable management chain can be
changed from one side to the other by
undoing and mirroring the fixings
Fixing holes X5 front
& back of mechanism
x6 key hole slots
Holes for cables to be
threaded through
Loosen toggles if
Bottom Plate is tight
when removing