background image

P

ro

je

cto

r M

ou

nts

 &

 D

ro

ps

email [email protected]  tel: +44 (0) 1438 833577  fax: +44 (0) 1438 833565

ISSUE 001

Installation Instructions

PD3.5 - Projector Drop Mechanism

Design Highlights

-Outputs for 3rd Party Product Control
-Cassette Housing for ease of Installation
-Full Cable Management
-Range of Drop Options
-Bespoke Sizing Option

Thank you for choosing

future

automation

Summary of Contents for PD3.5

Page 1: ...4 0 1438 833565 ISSUE 001 InstallationInstructions PD3 5 ProjectorDropMechanism Design Highlights Outputs for 3rd Party Product Control Cassette Housing for ease of Installation Full Cable Management...

Page 2: ...n result in serious personal injury or damage to equipment Future Sound Vision trading as Future Automation intend to make this and all documentation as accurate as possible However Future Automation...

Page 3: ...Distances 6 Stage 2 Creating The Void 7 Installment Of The Unit Into The Ceiling 7 Control Box Set up 7 Stage 3 Installation Of The Unit Into The Ceiling 8 Stage 4 Mounting Details 9 Stage 5 Adjustme...

Page 4: ...by misuse or damage accidental or otherwise or service modification by persons not authorised by Future Automation or the use of any non Future Automation supplied parts Any electrical or other enviro...

Page 5: ...Ceiling Lip 1 4 Main Box 1 5 Cable Track 1 6 Scissor Arms 1 7 Slider Channel 1 8 Top Cover Lid 2 Control Box 3 IR Remote Control Not Shown On Page 4 x2 AAA Batteries 5 Multi Pack Of Nuts Bolts Washer...

Page 6: ...ions Installation Stage 1 Page 5 of 18 email info futureautomation co uk tel 44 0 1438 833577 fax 44 0 1438 833565 PD3 5 ProjectorDropMechanism Do not test the unit when it is sitting on the floor Str...

Page 7: ...emote sensor even if you are going to use switch control Cables can be easily extended There is no manual drop function access is required for servicing Timber Joists Inside faces of joists need to ta...

Page 8: ...then lowering through the key hole details ORGANISE THE CABLES READY TO THREAD THROUGH THE CABLE HOLES ON THE SIDE OF THE UNIT Secure into place using screws through the fixing holes x10 total Check...

Page 9: ...y fix the projector to the top surface of the carriage using the range of nuts bolts washers provided in the multipack Base Plate slides into place toggles go through key hole detail to lock into plac...

Page 10: ...The yellow button adjusts the drop to change the stop position push the yellow button IN to cancel the preset position and using the remote IN OUT and STOP buttons stop the PD at the desired height P...

Page 11: ...opMechanism Final checks Check the mechanism is working correctly Make sure the projector is secure Important Make sure to check that the straps are set up correctly Overlapping square and neatly Chec...

Page 12: ...both the AC1 and DC1 Optional Electric screen can be connected using the control box using the AC2 block The AC2 output can only control a 240V 110V motorised screen to work simultaneously with the pr...

Page 13: ...rs 568A 568B 1 12V SUPPLY 12V SUPPLY CURRENT LIMITED W G W O 2 12V LATCH When 12V attached device will go OUT When 12V removed device will go IN G O 3 GROUND GROUND W O W G 4 PIN 4 NOT USED BL BL 5 DE...

Page 14: ...nce broken removed This is where we recommend wiring a safety device For a range of safety devices see control safety accessories section in product brochure DC1 Up Delay Link CC3 to 0V to delay the p...

Page 15: ...Future Automation IR Remote Controller needs x2 AAA batteries which are provided within the packaging Out Lowers the projector In Raises the projector Stop Will stop the operation at any point Operati...

Page 16: ...n control box 13 Incorrect settings Refer to instructions 14 Incorrect pin configuration Terminate 6 pin RJ11 to configuration supplied 14 ASC11 protocol error Amend Protocol 14 Lift not level Straps...

Page 17: ...Test motor operation If the lift is not working you can test the motor directly To do so you will need to locate and open the control box CAUTION Apply mains voltage taking all necessary grounding pre...

Page 18: ...e Automation Unit 2 Kimpton Enterprise Park Claggy Road Kimpton Hertfordshire SG4 8HP United Kingdom Tel 44 0 1438 833 577 Fax 44 0 1438 833 565 Email info futureautomation co uk www futureautomation...

Reviews: