1. Interlock battery
2. Contacts
1. Place the charging station on a
firm, even, dry, clean and free
underground.
2. Plug the charging station in the
power outlet.
Fig. 9
Fig. 10
4
2.6 Battery
3 Operation
3.1 Initial startup
3.1.1 Setting up the charging station
● Observe all technical data according to the operating conditions (3 Technical Data).
● The installation surface must be even and must dispose of sufficient stability and payload.
● The location of installation must be protected against humidity and rain.
● Power outlets in the outer area must be equipped with a residual current circuit breaker (FI).
● The workplace must dispose of sufficient illumination and ventilation.
● The location of installation must be out of reach of children.
3. The charging station has electronics that constantly check its functions.
A switchover may therefore last up to 3 seconds.
4. Correctly to the power outlet and the charging station is ready for use.
5. If the battery is very depleted, the charging station wakes the battery.
This may require up to 5 minutes. After that the normal charging process will start.