1. HOW TO INSTALL THE SYSTEM
1-8
How to install the stays (anti-vibration and anti-shock measures)
This measure must be done after installing the hull unit to prevent damage from vibra-
tion or impact shock to the transducer. Stays should be as sturdy as possible
(75
×
75
×
9 mm minimum recommended). Install a minimum of two stays, one in the aft
direction, one in the fore direction. Where possible install two more stays (one in the
port and one in the starboard direction), making a total of four stays. Where the hull
unit is installed off center from the bow-stern line, install the stays at right angles with
the bow mark on the hull unit.
Where horizontal installation of the stays is not possible, install the stays in a diagonal
manner to reduce vibration in the hull unit.
Bow mark
Stay
Recommended stay installation
Eye bolt
Ceiling beam
Stays installed diagonally have
their effectiveness reduced.
Install stays as close to
horizontal as possible.
Stay
90°
Bow mark
Stay
Non-horizontal stay installation
Stay
Secured to ship’s
hull frame work.
Summary of Contents for FSV-85-MARK-2
Page 34: ...1 HOW TO INSTALL THE SYSTEM 1 26 This page is intentionally left blank ...
Page 58: ...2 WIRING 2 24 This page is intentionally left blank ...
Page 86: ...D 1 7 Jul 2021 H MAKI ...
Page 87: ...D 2 7 Jul 2021 H MAKI ...
Page 88: ...D 3 7 Jul 2021 H MAKI ...
Page 89: ...D 4 7 Jul 2021 H MAKI ...
Page 90: ...D 5 7 Jul 2021 H MAKI ...
Page 91: ...D 6 7 Jul 2021 H MAKI ...
Page 92: ...22 Apr 2014 H MAKI D 7 ...
Page 93: ...D 8 24 Jun 2021 H MAKI ...
Page 94: ...D 9 24 Mar 2021 H MAKI ...
Page 95: ...D 10 24 Jun 2021 H MAKI ...
Page 96: ...D 11 24 Jun 2021 H MAKI ...
Page 98: ...D 13 17 Feb 2021 H MAKI ...
Page 99: ...28 Apr 2018 H MAKI D 14 ...
Page 100: ...D 15 13 Sep 2011 Y NISHIYAMA ...
Page 101: ...D 16 13 Sep 2011 Y NISHIYAMA ...
Page 102: ...D 17 13 Sep 2011 Y NISHIYAMA ...