background image

Apply glue onto the wood dowels (#D) 
and insert into the bottom right frame (#4). 
Apply glue onto the other ends and 
insert shelves (#8,9).

1.

I.  Insert the barrel nut (#C), Slide the Phillip head screw (#A) through the hole on the 
    side of the post piece until it bumps against the nut. 
II. Use your screwdriver to rotate the barrel nut (#C) until the hole is lined up with the 
    end of the screw. Hold the barrel nut in position with your screwdriver. Simultaneously 
    use the wrench to turn the screw. Continue tightening until the bolt is fully seated.

2.

Apply glue onto the wood dowels (#D) 
and insert into the bottom left frame (#3).
Apply glue onto the other ends and 
insert shelves (#8,9).

1.

I.  Insert the barrel nut (#C), Slide the Phillip 
    head screw (#A) through the hole on the 
    side of the post piece until it bumps 
    against the nut. 
II. Use your screwdriver to rotate the barrel 
    nut (#C) until the hole is lined up with the 
    end of the screw. Hold the barrel nut in 
    position with your screwdriver. 
    Simultaneously use the wrench to turn 
    the screw. Continue tightening until the 
    bolt is fully seated.

2.

Reviews: