background image

Connect threaded bolts (#B) to barrel nuts (#E) 
through the upright board (#3). Attach dowels 
(#F) onto the upright board (#3). 

Align upright board (#3) onto 
bottom board (#4), then secure 
by using nuts (#D) with 
washers (#C).

Cover barrel nuts by using stickers (#K).

Align connections (#5) to the frame, then 
secure by using screws (#G).

Reviews: