8
Fill up the excavation
(Be careful not to move the timbers when doing this!)
Step on the timbers to press them firmly into the sand
Align the sockets with each other - inserting the net poles
will be helpful
The sockets are designed with a 2° sloping angle to the
outwards.
Set ground sockets with timbers into excavation; be careful
not to step onto the borders of the excavation
OPTION: CITY BEACH
Assembly
2°
2°
Minimum: 35 cm