- 31 -
Instruction Manual – ATS / BTS Moisture Analyzers
7.
After the tare is complete, the screen requests that the External Load, to be placed on the pan.
8.
Place the External Load on the pan.
9.
When the calibration weight is placed on the
pan, the scale will automatically begin the
calibration process.
10.
When calibration is complete, the calibration
mass value will be displayed.