5-2
SPARC Enterprise M3000 Server Service Manual • March 2012
Caution –
To ensure that you and bystanders are not exposed to harm and to
prevent damage to the system, observe the ESD safety precautions. See
.
1. If the equipment rack is supplied with a Quake-Resistant Options Kit or
stabilizer, be sure to install it.
2. Slide the server out as far as possible.
When the server is drawn out completely, the server is automatically locked in
the predetermined position.
3. Loosen the two screws at the front of the server (
FIGURE 5-1
Pulling the Server Out from an Equipment Rack
4. Slide the server out.
Summary of Contents for SPARC Enterprise M3000
Page 4: ......
Page 91: ...Chapter 5 Internal Components Access 5 5 FIGURE 5 3 Removing the Air Duct ...
Page 114: ...7 10 SPARC Enterprise M3000 Server Service Manual March 2012 ...
Page 120: ...8 6 SPARC Enterprise M3000 Server Service Manual March 2012 ...
Page 128: ...9 8 SPARC Enterprise M3000 Server Service Manual March 2012 ...
Page 146: ...12 6 SPARC Enterprise M3000 Server Service Manual March 2012 ...
Page 152: ...13 6 SPARC Enterprise M3000 Server Service Manual March 2012 ...
Page 160: ...14 8 SPARC Enterprise M3000 Server Service Manual March 2012 ...
Page 166: ...15 6 SPARC Enterprise M3000 Server Service Manual March 2012 ...
Page 170: ...A 4 SPARC Enterprise M3000 Server Service Manual March 2012 ...
Page 178: ...B 8 SPARC Enterprise M3000 Server Service Manual March 2012 ...