![background image](http://html.mh-extra.com/html/fujitsu/sparc-enterprise-m3000/sparc-enterprise-m3000_installation-manual_121303034.webp)
2-8
SPARC Enterprise M3000 Server Installation Guide • January 2009
2.3
Requirements for Server Installation
The following items and information are required for installing the server. Prepare
them before installation.
■
Screwdriver, Phillips No. 2
Used for mounting the server on the rack
■
Wrist strap
Used to prevent static electricity from the human body from damaging the server
■
Conductive mat
■
Ethernet cable of category 5 or higher
■
Administration console
Obtain one of the following from the customer:
■
ASCII terminal
■
Workstation
■
Terminal server (or a patch panel connected to a terminal server)
■
Personal computer (PC)
■
XSCF unit configuration information (IP address, subnet mask, default gateway,
etc.)
■
Domain configuration information (IP address, subnet mask, default gateway,
etc.)
■
Circuit tester
Used to check the input AC voltage
Summary of Contents for SPARC Enterprise M3000
Page 1: ......
Page 2: ......
Page 6: ......
Page 9: ...Contents vii B 3 4 2 fmdump e Command B 10 ...
Page 10: ...viii SPARC Enterprise M3000 Server Installation Guide January 2009 ...
Page 22: ...xx SPARC Enterprise M3000 Server Installation Guide January 2009 ...
Page 48: ...3 14 SPARC Enterprise M3000 Server Installation Guide January 2009 ...
Page 56: ...4 8 SPARC Enterprise M3000 Server Installation Guide January 2009 ...
Page 64: ...A 8 SPARC Enterprise M3000 Server Installation Guide January 2009 ...
Page 75: ......
Page 76: ......