Chapter 4 Trace startup procedure
an-mb86r01-trace-rev0-01.doc
- 8 -
© Fujitsu Microelectronics Europe GmbH
4 Trace startup procedure
The following steps are necessary to configure and enable the trace functionality:
1. Power up Super Trace Probe (STP)
2. Power up the Jade Evaluation Board
3. Configure STP (must only be done when you start the STP for the first time)
set etm_version 3
Note: clock <= 6 Mhz
4. Start the Multi Debugger
5.
Connect to the target
Note: The ETM clock is now running and the tracing LED is on
6. Reset the target
7. Download the program to the target