Starter Kit MB2146-410-01-E Setup Guide V1.1
Chapter 5 Development Platform Quick Start
MCU-UM-500002-E-11 – Page
21
5 Development Platform Quick Start
5.1 Tools Setup Sequence
Start the debugging system in the following sequence:
Connect a BGMA to the PC using a USB cable, confirm the LED on the BGMA is Green;
Connect an EV-board to BGMA IDC10 socket;
Select the EV-board power supply and turn on the EV-board, confirm the LED on the
BGMA is Orange and the Power LED on the EV-board is on.
5.2 Open Project and Start Debug
Users can start a debug from a PC software SOFTUNE workbench in the following
sequence. Here take IO_LED project for example.
Start the SOFTUNE from “Startup Menu>Programs> SOFTUNE V3> FFMC-8L Family
SOFTUNE Workbench” in Windows;
Click “Open workspace” from “File” Menu in SOFTUNE;
Select “IO_LED.wsp” in “Open Space” window;
Click “Start debug” from “Debug” Menu.
If the entire procedure goes right, a debug will start normally.
5.3 Operation Precautions
All pins of MB95200H/210H MCU are connected to Testing Pin on the EV-board. If the
user wants to test separate pin performance, do open the header of related peripheral
modules.
Note that J2 shall be open while debugging using the BGMA. User reset from S3 (reset
key) is invalid when J2 is open. To use reset key S3 in a normal mode, J2 should be
closed.
It’s recommended that only one power supply is used as a power module input at a time.