10
Technical Manual
D2860
(BX920)
CE Certificate
Important notes
©
c
o
gni
ta
s
. Ge
s
e
lls
c
h
ft
f
ü
r T
e
c
h
n
ik
-Do
k
u
m
e
nt
at
io
n
m
b
H 2
010
P
fad:
R:
\B
X
9
20
_S
1\
T
H
B
\D
2
8
60-
T
H
B
_
in
-A
rb
e
it
_
201
0-
01\
d2
86
0-t
h
b-e
n
\d
2
860
-t
hb
-e
n.
k
0
2
Notes about boards
●
During installation/deinstallation of the system board, observe the specific
instructions described in the service manual for the server.
●
Remove the plug from the mains outlet so that system and system board are
totally disconnected from the mains voltage.
●
To prevent damage to the system board, the components and conductors on
it, please take great care when you insert or remove boards. Take great care
to ensure that extension boards are slotted in straight, without damaging
components or conductors on the system board, or any other components,
for example EMI spring contacts.
●
Be careful with the locking mechanisms (catches, centring pins etc.) when
you replace the system board or components on it, for example memory
modules or processors.
●
Never use sharp objects (screwdrivers) for leverage.
2.2
CE Certificate
The board complies with the requirements of the EC directives
2004/108/EC regarding “Electromagnetic Compatibility” and
2006/95/EC “Low Voltage Directive”. This is indicated by the CE
marking (CE = Communauté Européenne).
Compliance was tested in a typical PRIMERGY configuration.