background image

34

Options Guide

 BX630 

S2

Replacing memory modules

Memory

©

 c

o

g

n

it

as

G

e

s

e

lls

c

h

ft

 f

ü

r T

e

c

hni

k

-D

o

k

u

m

e

n

tat

ion m

b

H

 20

07 

P

fa

d

H

:\

A

p

ri

l\

P

R

IM

E

R

GY

_R

eb

ran

d

in

g

\v

o

n W

a

lt

er

\b

x

630

_s

2_

og\

bx

63

0s

2-

og

-e

n

\O

B

J

_

DO

K

U

-2

61

2-0

0

1

.f

m

6.2

Replacing memory modules

V

CAUTION!

Note the safety instructions and the information on handling electro-
statically sensitive devices on 

page 18

.

Install the memory modules very carefully. Too much pressure can 
damage the ejection tabs.

Ê

Remove the server blade from the basic unit and open it as described in the 

chapter “Preparation” on page 19

.

Figure 19: Removing a memory module

Ê

Fold the tabs outwards on both sides of the relevant slot (1).

Ê

If a memory module was already installed in the slot: Remove the memory 
module from the slot (2).

1

1

2

Summary of Contents for BX630 - PRIMERGY - S2 Dual

Page 1: ...PRIMERGY BX630 S2 Scalable Server Blade Options Guide Edition October 2007 ...

Page 2: ...ed to meet the regulations of a quality management system which complies with the requirements of the standard DIN EN ISO 9001 2000 cognitas Gesellschaft für Technik Dokumentation mbH www cognitas de Copyright and Trademarks cognitas Gesellschft für Technik Dokumentation mbH 2009 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2605 001 fm Copyright 2009 Fujitsu Techn...

Page 3: ...ions 7 1 4 Structure of the server blade 8 1 5 Configurations 10 1 6 Notational conventions 12 2 Procedure 13 3 Safety instructions 15 4 Preparation 19 5 Processors 23 5 1 Installing a second processor 23 6 Memory 31 6 1 Fitting rules 32 6 2 Replacing memory modules 34 7 Optional I O module 37 7 1 Installing an I O daughter card 41 ...

Page 4: ...07 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2606 001 fm 8 Replacing the battery 43 9 Upgrading to a quad socket server blade 45 9 1 Overview 45 9 2 Assembly instructions 47 10 Completion 57 10 1 Closing the server blade 57 Abbreviations 59 Index 63 ...

Page 5: ...nual may only be performed by technical specialists I The installation and removal of the hot plug components is described in the Operating Manual supplied with the server 1 2 Documentation overview More information on your PRIMERGY BX630 S2 can be found in the following documents Quick Start Software Quick Installation Guide leaflet only included as a printed copy Safety notes and other important...

Page 6: ...e online documentation available on the Internet can be found using the URL http manuals ts fujitsu com The PRIMERGY server documentation can be accessed using the Industry standard servers navigation option If you need a replacement copy of the ServerBooks DVD send the details of your server to the following e mail address rlc ts fujitsu com Further sources of information Manual for the monitor D...

Page 7: ...h memory bank can be fitted with 512 Mbyte 1 Gbyte 2 Gbyte or 4 Gbyte registered DDR2 667 MHz PC2 5300 memory modules The two memory modules of one bank must always be fitted in pairs and have the same capacity Optional I O module The server blade can be equipped with a 4 Gbit FC I O module or a 1 Gbit Ethernet I O module To allow use of the additional I O functionality at least one FC pass thru b...

Page 8: ...2007 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2607 001 fm 1 4 Structure of the server blade Figure 1 PRIMERGYBX630 S2 scalable server blade The above figure shows the positions of the most important components of the PRIMERGYBX630 S2 scalable server blade 2 1 3 4 6 7 8 5 10 9 ...

Page 9: ...ithium battery 4 DIMM slots for four DDR2 667 modules two banks assigned to CPU2 5 DIP switch SW4 user switch 6 Control panel board with connection cable 7 2 5 inch SAS SATA II hard disk module 1 8 2 5 inch SAS SATA II hard disk module 2 9 CPU 2 and heat sink 10 Position for a 4 Gbit FC daughter card or a 1 Gbit Ethernet daughter card optional I O module ...

Page 10: ...er blade or as a quad socket server blade The possible configura tions are shown in the following diagrams Dual socket server blade Figure 2 PRIMERGY BX630 S2 dual socket server blade Processor Hard disks I O module Main memory Basic configuration Optional module Opteron CPU 2 FC or GbE I O module or emtpy SAS SATA Bank 4 2 modules Opteron CPU 1 Bank 3 2 modules Bank 2 2 modules Bank 1 2 modules S...

Page 11: ...onfiguration Optional module Master Opteron CPU SAS Bank 1 2 modules Opteron CPU Bank 2 2 modules Bank 3 2 modules Bank 4 2 modules SAS SATA onboard 2 5 HDD module controller or dummy module SAS 2 5 HDD module or dummy module FC or GbE I O module or empty Slave Opteron CPU SAS Bank 5 2 modules Opteron CPU Bank 6 2 modules Bank 7 2 modules Bank 8 2 modules SAS SATA onboard 2 5 HDD module controller...

Page 12: ...nal conventions are used in this manual Text in italics indicates commands or menu items Quotation marks indicate names of chapters and terms that are being emphasized Ê describes activities that must be performed in the order shown V CAUTION pay particular attention to texts marked with this symbol Failure to observe this warning may endanger your life destroy the system or lead to the loss of da...

Page 13: ...the chapter Safety instructions on page 15 Ê Make sure that all the manuals you need are available and print out the PDF files if necessary You will definitely need the operating manuals of the server blade and of your BX600 S2 or BX600 S3 basic unit Ê Shut down the server blade correctly switch it off and remove it from the basic unit as described in the Completion Ê Extend or upgrade your server...

Page 14: ... cognitas Gesellschft für Technik Dokumentation mbH 2007 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2608 001 fm ...

Page 15: ...hock energy hazards fire hazards or damage the equipment Please note that any unauthorized opening of the server will void the warranty and exempt the manufacturer from all liability Before starting up V CAUTION During installation and before operating the device observe the instructions on environmental conditions for your device If the device is brought in from a cold environment condensation ma...

Page 16: ...s in the Operating Manual Do not connect or disconnect any data transmission cables during a thunderstorm lightning hazard Be careful to ensure that no objects e g jewelry paper clips etc or liquids get inside the device electric shock short circuit In emergencies e g damaged casing control elements or cables penetration of liquids or foreign bodies switch off the device immedi ately unplug it fro...

Page 17: ...AUTION Incorrect replacement of batteries can lead to risk of explosion The batteries may only be replaced with identical batteries or with a type recommended by the manufacturer see Options Guide Do not throw batteries into the trash can They must be disposed of in accordance with local regulations on special waste The German battery act obligates consumers in Germany to return waste batteries to...

Page 18: ...ve the power plug before installing or removing components containing ESDs You must always discharge yourself of static charges e g by touching a grounded object before working The equipment and tools you use must be free of static charges Only touch the components at the positions highlighted in green touch points Do not touch any exposed pins or conductors on a component Use a grounding cable de...

Page 19: ...it all applications and shut down the server blade correctly Ê Press the On Off button on the server blade control panel Removing the server blade from the basic unit Figure 5 Disengaging the server blade Ê Press the two touch points 1 to unlock the handles Ê Open out the two handles 2 simulta neously to disengage the server blade 1 2 2 1 ...

Page 20: ...itas Gesellschft für Technik Dokumentation mbH 2007 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2610 001 fm Figure 6 Removing the server blade from the basic unit Ê Pull the server blade out of the basic unit ...

Page 21: ...cover Figure 7 Removing the housing cover Ê Undo the two knurled screws 1 Ê Push the housing cover as far as possible in the direction of the arrow 2 Ê Take off the housing cover The server blade components are now freely accessible see figure 1 on page 8 1 1 2 ...

Page 22: ... cognitas Gesellschft für Technik Dokumentation mbH 2007 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2610 001 fm ...

Page 23: ...e with the smooth side down Never slide a processor over a surface 5 1 Installing a second processor The BX630 S2 dual socket server blade can be upgraded with a second processor The upgrade kit includes a processor and a heat sink V CAUTION Always use processors of the same type All processors must have the same frequency and cache size For multi processor mode use a suitable multi processor oper...

Page 24: ...ants The following section describes how to install a processor in the Foxconn processor socket Differences in handling a Tyco processor socket are indicated in the relevant steps Figure 9 Processor socket variant 1 Opening the socket Ê Remove the protective cover by lifting it at the edge 1 Ê Release the locking lever 2 by first pressing it down and then swiveling it up as far as it will go Foxco...

Page 25: ...uide 25 Processors Installing a second processor Figure 10 Processor socket variant 1 Opening the locking frame Ê Swivel the locking lever of the processor socket upward Ê Remove the processor from its protective wrapper ...

Page 26: ...ssor Foxconn socket Ê Position the new processor above the socket and press it carefully into the socket V CAUTION The processor can only be installed in one direction Make sure that the recesses on the processor A are aligned with the corresponding positioning elements lugs on the socket I The Tyco processor socket only has positioning elements on one side see A in figure 12 Figure 12 Processor s...

Page 27: ... second processor Figure 13 Locking the processor Foxconn socket Ê Fold the locking frame of the processor socket down Ê Swivel the locking lever of the socket down Ê Lock the locking lever by pressing it under the bracket 1 on the processor socket 1 ...

Page 28: ...ad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2611 001 fm V CAUTION When locking the Tyco processor socket make sure that the small clips on the locking frame A slide under the corresponding brackets on the outer socket frame see figure 14 Figure 14 Locking the processor Tyco processor socket A ...

Page 29: ...Processors Installing a second processor Installing the heat sink Figure 15 Preparing the heat sink Ê Remove the yellow tape from the underside of the heat sink and then remove the transparent cover protecting the thermal paste ...

Page 30: ...Technik Dokumentation mbH 2007 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2611 001 fm Figure 16 Fastening the heat sink Ê Place the heat sink on the processor and fix it with the three supplied screws Fasten the screws in the order shown in the figure 1 2 3 ...

Page 31: ...memory banks comprising eight slots which can be fitted in pairs with 512 MB 1 GB 2 GB or 4 GB DDR2 667 memory modules The board supports a maximum memory configuration of 32 GB Figure 17 PC3200 DDR SDRAM module The memory modules are marked with a dent A so that you cannot install them the wrong way round A ...

Page 32: ...o CPU 2 i e they can only be fitted if CPU 2 is installed The following rules also apply The DIMM slots must be fitted one bank at a time A memory bank comprises two DIMM slots The two DIMM modules of one bank must have the same type identical capacity identical clock rate single ranked or dual ranked If only CPU 1 is installed Start with DIMM 1 2 followed by DIMM 3 4 If CPU 1 and CPU 2 are instal...

Page 33: ...r module then DIMM 1 2 followed by DIMM 5 6 in the slave module Install additional DIMMs in DIMM 3 4 followed by DIMM 7 8 in the master module followed by DIMM 3 4 and DIMM 7 8 in the slave module If you install memory modules for a CPU which have different memory capacities you must first install the modules with the lower memory capacity ...

Page 34: ...nd the information on handling electro statically sensitive devices on page 18 Install the memory modules very carefully Too much pressure can damage the ejection tabs Ê Remove the server blade from the basic unit and open it as described in the chapter Preparation on page 19 Figure 19 Removing a memory module Ê Fold the tabs outwards on both sides of the relevant slot 1 Ê If a memory module was a...

Page 35: ...gure 20 Installing a memory module Ê Carefully press the memory module into the slot 1 until the fastening tabs on both sides of it engage 2 Ê Close the server blade insert it in the basic unit and switch it on as described in chapter Completion on page 57 2 2 1 ...

Page 36: ... cognitas Gesellschft für Technik Dokumentation mbH 2007 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2612 001 fm ...

Page 37: ... S2 server blade 4 Gbit Fibre Channel daughter card PCIe 1 Gbit Ethernet daughter card PCIe 10 Gbit Ethernet daughter card PCIe I To allow use of the additional I O functionality at least one FC I O blade or an Ethernet I O blade must be installed in slot NET3 and or NET4 of the PRIMERGY BX600 S2 or BX600 S3 basic unit For further infor mation on I O blades see the operating manual for your basic ...

Page 38: ...bit Fibre Channel daughter card PCIe The 4 Gbit FC daughter card PCIe provides two independent serial 1 2 4 Gbit s FC ports It is fitted with an Emulex chip and supports multiple FC storage subsystems of the corresponding versions I The 4 Gbit FC daughter card can only be used in combination with the 4 4 Gbit FC switch blade For more information see the BX600 S3 operating manual The 4 Gbit FC opti...

Page 39: ...1 Gbit Ethernet daughter card PCIe Figure 22 Gbit Ethernet daughter card PCIe The 1 Gbit Ethernet daughter card PCIe has two Broadcom 5708S chips and provides two 1 Gbit s Ethernet ports TOE TCP IP Offload Engine and iSCSI iSCSI Boot are supported ...

Page 40: ...ughter card PCIe Figure 23 10 Gbit Ethernet daughter card PCIe The 10 Gbit Ethernet daughter card PCIe provides two 10 Gbit s Ethernet ports This module also supports TOE TCP IP Offload Engine and iSCSI iSCSI Boot I The 10 Gbit Ethernet daughter card PCIe can only be used in combi nation with the 10 Gbit switch blade 10 2 For further information see the operating manual for your BX600 S2 or BX600 ...

Page 41: ...pter Safety instruc tions on page 15 Ê Remove the server blade from the basic unit and open it as described in the chapter Preparation on page 19 Figure 24 Position for an I O daughter card Ê Place the I O daughter card onto the two sockets A Ê Fasten the I O daughter card with three screws The corresponding nuts on the system board are indicated by arrows in figure 24 A ...

Page 42: ... cognitas Gesellschft für Technik Dokumentation mbH 2007 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2613 001 fm ...

Page 43: ...handling batteries in the section Batteries on page 17 Incorrect replacement of batteries may result in a risk of explosion The batteries must be replaced with an identical battery or with a battery type recommended by the manufac turer Make sure you insert the battery correctly The positive pole must face toward the inside of the server blade Figure 25 Replacing the battery Ê Press the locking le...

Page 44: ... cognitas Gesellschft für Technik Dokumentation mbH 2007 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2614 001 fm ...

Page 45: ...it The master module is on the right side identifiable by the handles and the control elements A on the control panel board The slave module has the handles removed and the control panel has been replaced by a dummy module The slave module has a fixed connection to the housing cover of the master module The two modules of the quad socket server blade exchange data through small circuit boards with...

Page 46: ... server blades to form a quad socket server contains the following elements Figure 27 Side band element The side band element connects the server management bus of the master module to that of the slave module see also Inserting the HT link elements and the side band element on page 53 Figure 28 HT link element Two HyperTransport link elements HT link elements connect the system bus of the master ...

Page 47: ...screws for fastening the slave module The slave module is fastened to the housing cover of the master module with 5 shoulder screws see also page 51 9 2 Assembly instructions The following section describes the steps you need to perform to upgrade the server blade to a quad socket server blade The links take you to the sections with the descriptions of the individual steps Removing the handles of ...

Page 48: ...e The quad socket server blade is locked in the BX600 S2 or BX600 S3 basic unit using the handles of the master module You must remove the handles of the slave module Figure 31 Removing the handles Ê Remove the housing cover of the slave module see page 21 Ê Undo the pins of the joints A with a Philips screwdriver and remove them from the housing Remove the handles Removing the control panel board...

Page 49: ...ard of the slave module Figure 33 Removing the control panel board Ê Undo the two screws 1 fastening the control panel board to the server blade housing Ê Loosen the clamping bracket 2 and disconnect the cable of the control panel board from the connector on the system board Figure 34 Removing the control panel board Ê Remove the control panel board with the connection cable from the server blade ...

Page 50: ... master module Mount the guides for the exact positioning of the HT link elements and the side band element on the underside of the master module housing cover figure 35 shows a prepared housing cover Figure 35 Housing cover of the master module underside with guides for the link elements Ê Remove the housing cover of the master module see page 21 Figure 36 Housing cover of the master module with ...

Page 51: ...e master module to the slave module Figure 37 Fastening the housing cover of the master module to the slave module Ê Place the prepared housing cover of the master module on the underside of the slave module Ê Fasten the housing cover of the master module with 5 screws The screw holes are indicated by arrows in figure 37 ...

Page 52: ...ule Figure 38 Closing the master module Ê Turn the slave module over so that the housing cover of the master module and the guide elements face down Carefully place the slave module onto the housing of the master module such that it projects 1 2 cm at the back Make sure that the slave module lies flush with both sides of the master module Ê Push the slave module in the direction of the arrow as fa...

Page 53: ...h two HT link elements and the side band element These double sided printed circuit boards are plugged into special sockets on the system boards and connect the bus systems of the two modules Figure 39 Connection with an HT link element The figure above shows a diagram of the connection between the system board of the master module 1 and the system board of the slave module 2 by way of an HT link ...

Page 54: ...30_s2_og bx630s2 og en OBJ_DOKU 2615 001 fm The figure below shows the positions of the sockets for the HT link elements a b and the side band element c on the BX630 S2 system board Figure 40 Position of the sockets for the HT link and side band elements V CAUTION Make sure you insert the link elements with the correct side facing the front as shown in the following figures CPU1 CPU2 b a c ...

Page 55: ...r blade Assembly instructions Figure 41 Inserting the side band element Ê Insert the side band element in the socket A The metal edge B must face inward Figure 42 Installed side band element Ê Carefully press the side band element down as far as it will go A B ...

Page 56: ...0_s2_og bx630s2 og en OBJ_DOKU 2615 001 fm Figure 43 Installing the HT link elements Ê Insert the HT link elements in the sockets The metal edges A must face outward Figure 44 Installed HT link elements Ê Carefully press the HT link elements down as far as they will go This completes the upgrade to a quad socket server blade Now proceed as described in the chapter Completion on page 57 A A ...

Page 57: ...g the housing cover Ê Place the housing cover onto the server blade such that it projects 1 2 cm at the back Ê Push the housing cover forward as far as possible 1 Ê Fasten the two green knurled screws 2 Ê Insert the server blade in the basic unit I To install the server blade in the basic unit perform the procedure described in the chapter Preparation on page 19 in reverse 1 2 2 ...

Page 58: ... cognitas Gesellschft für Technik Dokumentation mbH 2007 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2616 001 fm ...

Page 59: ...ology Attachments BIOS Basic Input Output System CD Compact Disk COM Communication CPU Central Processing Unit DBMS Database Management System DDR Double Data Rate RAM DIMM Dual Inline Memory Module DVD Digital Versatile Disk ECC Error Correcting Code EDC Error Detection Code EMC Electromagnetic Compatibility ...

Page 60: ...bx630s2 og en OBJ_DOKU 2617 001 fm ESD Electrostatic Discharge FC Fibre Channel GAM Global Array Manager HDD Hard Disk Drive HU Height Unit I O Input Output ID Identification IDE Integrated Drive Electronics IP Internet Protocol iSCSI Internet SCSI LAN Local Area Network LCD Liquid Crystal Display LED Light Emitting Diode MRL Manually Retention Latch ...

Page 61: ...rconnect PDA Prefailure Detection and Analyzing POST Power On Self Test PSU Power Supply Unit RAID Redundant Arrays of Independent Disks ROM Read Only Memory SAN Storage Area Network SAS Serial Attached SCSI SATA Serial ATA SCA Single Connector Attachment SCSI Small Computer System Interface SCU Server Configuration Utility ...

Page 62: ...schft für Technik Dokumentation mbH 2007 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2617 001 fm SFP Small Form Factor Pluggable USB Universal Serial Bus VGA Video Graphics Adapter VPD Vital Product Data WOL Wakeup on LAN ...

Page 63: ...4 Gbit Fibre Channel PCIe 38 information material additional 6 L Lithium battery 17 lithium battery 43 M main memory extend 7 meaning of the symbols 12 N notational conventions 12 O optional I O module 37 P processor add 7 Q quad socket upgrade assembly instructions 47 56 overview 45 upgrade kit 46 R replace battery 43 S SDRAM 31 fitting rules 32 server blade battery 43 close 57 open 21 remove fro...

Page 64: ... cognitas Gesellschft für Technik Dokumentation mbH 2007 Pfad H April PRIMERGY_Rebranding von Walter bx630_s2_og bx630s2 og en OBJ_DOKU 2618 001 fm ...

Reviews: