Brocade 5450 Hardware Reference Manual
35
53-1001266-02
Accessing the Embedded Switch Module
4
Accessing the Embedded Switch Module
The Embedded Switch Module is managed as a single element. It has a single IP address and
appears as a separate entity to the Telnet protocol and the Simple Network Management Protocol
(SNMP).
When SNMP devices send SNMP messages to a management console running SAN management
software, the information is stored in a Management Information Base (MIB). The Brocade 5450
Embedded Switch Module with Fabric OS 6.2.0_emb or 6.3.0 and greater supports the
FibreAlliance Fibre Channel Management (FCMGMT) MIBs, allowing the provision of needed
information to a SAN administrator.
In addition, the Brocade Fabric Access Layer (API) and the Storage Management Initiative (SMI)
provide facilities for the discovery and management of physical and logical elements in a SAN.
Using the Fabric Access interface to the Fabric OS, a client application can retrieve information and
modify the configuration of Brocade switches in the fabric.
Secure Telnet access is available using Secure Shell (SSH), a network security protocol for secure
remote login and other secure network services over an insecure network.
Brocade Web Tools management is available through a secure browser using Secure Sockets Layer
(SSL). The SSL security protocol provides data encryption, server authentication, message integrity,
and optional client authentication for a TCP/IP connection. Because SSL is built into all major
browsers and Web servers, installing a digital certificate enables the SSL capabilities.
Interpreting POST results
The power-on self test (POST) system check is performed each time the Embedded Switch Module
is powered on, rebooted, or reset.
Example POST Output
POST1: Started running Tue Nov 9 20:27:57 GMT 2004
POST1: Test #1 - Running turboramtest
POST1: Test #2 - Running centralmemorytest
POST1: Test #3 - Running cmitest
POST2: Running diagshow
POST1: Script PASSED with exit status of 0 Tue Nov 9 20:28:10 GMT 2004 took
(0:
0:13)
POST2: Started running Tue Nov 9 20:28:12 GMT 2004
POST2: Test #1 - Running camtest
POST2: Test #2 - Running txdpath
POST2: Test #3 - Running spinsilk (SERDES)
POST2: Running diagshow
POST2: Script PASSED with exit status of 0 Tue Nov 9 20:29:11 GMT 2006 took
(0:
0:59)
Initializing Ports ....
Port Initialization Completed
Enabling switch...
During POST, the LEDs are activated in various indicator patterns.
Perform the following steps to determine POST completion status.
Summary of Contents for BR5450
Page 7: ...vi Brocade 5450 Hardware Reference Manual 53 1001266 02 ...
Page 27: ...14 Brocade 5450 Hardware Reference Manual 53 1001266 02 Cabling guidelines 2 ...
Page 45: ...32 Brocade 5450 Hardware Reference Manual 53 1001266 02 3 ...
Page 65: ...52 Brocade 5450 Hardware Reference Manual 53 1001266 02 Environmental regulation compliance A ...
Page 69: ...56 Brocade 5450 Hardware Reference Manual 53 1001266 02 ...