19
5. Development Platform Quick Start
5.1 Tools Setup Sequence
Start the debugging system in the following sequence:
•
Connect a BGMA to the PC using a USB cable, confirm the LED on the BGMA is Green;
•
Connect an EV-board to BGMA IDC10 socket;
•
Select the EV-board power supply and turn on the EV-board, confirm the power LED on the
BGMA is Orange and the Power LED on the EV-board is on.
5.2 Open Project and Start Debug
Users can start a debug from a PC software SOFTUNE workbench in the following sequence. Here
take IO_LED project for example.
•
Start the SOFTUNE from "Startup Menu>Programs> SOFTUNE V3> FFMC-8L Family
SOFTUNE Workbench" in Windows;
•
Click "Open workspace" from "File" Menu in SOFTUNE;
•
Select "IO_LED.wsp" in "Open Space" window;
•
Click "Start debug" from "Debug" Menu.
If the entire procedure goes right, a debug will start normally.
5.3 Operation Precautions
•
All pins of MB95560H/570H/580H MCU are connected to Testing Pin on the EV-board. If
the user wants to test separate pin performance, do disconnect the header of related peripheral
modules.
•
For the power of STK EV-board, do not use the different power supply (single-3 battery or 9V
DC) at the same time
•
Since the device and BGMA may be broken, please use the bundled BGMA with STK EV-
board.
Summary of Contents for 8FX MB2146-510-01-E
Page 25: ......